background image

8

JPK 3

Operation

5.

Operation

ATTENTION

(see chapter “Security Advices and Dan-
gers in Case of Non-compliance”)

The chapter “Intended Use” has obligatorily
be observed!

5.1

Putting into Operation

Before the putting into operation [initial com-
missioning] or the putting into operation after
maintenance works the sample water cooler
has to be 

filled

 with water!

open the cooling water inlet valve.

the enclosed air  will be flushed through
the sample water cooler and removed af-
ter the cooling water inlet valve having
been opened.

after having been ventilated the sample
water cooler is ready for service.

5.2

Description of the Functioning

The periodic control of the water qualities
concerning the feed water, the boiler water

and the condensate ranks among the most
important tasks in the boiler house. It often
happens that no water analysis is effected,
due to a lack of appropriate removal installa-
tions.

The removal of hot water samples is not only
dangerous but leads inevitably  to imprecise
and false analysis results. 

Therefore the measurement of the content
of  oxygen binder is not possible, due to the
fact that in the case of high temperature im-
mediately a reaction  with  atmospheric oxy-
gen takes place. Concerning boiler waters
the evaporation loss has to be taken into
consideration, when calculating the results.

A  correct result of the water examination
can only be achieved, if a sampling device is
available, that corresponds to the operating
conditions. The analysis of the water sam-
ples  takes place, in general, at a referring
temperature of 20°C (68 °F).

This induces the having to be cooled-down
of the water samples exceeding this temper-
ature.

In doing so the measuring good is led into a
stainless steel heat exchanger via the sam-
ple water ball cock and  cooled down by the
cooling water flowing counter-current.

Fig. 3:

Description of the Functioning

sampling water

built-in rotary flange

sample water ball cock G ¼" IG

cooling water inlet valve

cold water system

boiler water

feed water

condensate

shut-off  possibility

Содержание JPK 3

Страница 1: ...ing and putting the unit into service These must always be issued to the owner user Prolongated guarantee period if a maintenance contract has been concluded Installation and Operating Instructions JU...

Страница 2: ...rints even of extracts is only permitted with special approval Dear Customer We would like to thank you for your con fidence in us which you have shown by purchasing this device The product you have p...

Страница 3: ...ooler These operation instructions shall make it easier to become acquainted with the sam ple water cooler and to profit from its intend ed field of application The operation instructions contain impo...

Страница 4: ...attention to imperatively and have to be kept in a completely legible state 1 2 Security Advices and Dan gers in Case of Non compli ance In detail the non compliance of the general danger symbols can...

Страница 5: ...e obser vance of the operation instructions Before using the sample water cooler bey ond the utilization limits stated in the opera tion manual the manufacturer supplier ha ve by all means to be conta...

Страница 6: ...water cooler the free space should not be less than 250mm These distances are necessary in order to be in a position to effectuate and easy operation and maintenance in a proper way For the shut off...

Страница 7: ...lt in rotary flange can be caused Considerable water damages can be the consequential effect Persons that stay near to the sample water cooler are exposed in that case to a sani tary risk due to hot w...

Страница 8: ...l of hot water samples is not only dangerous but leads inevitably to imprecise and false analysis results Therefore the measurement of the content of oxygen binder is not possible due to the fact that...

Страница 9: ...o 30 l h 0 05 up to 0 13 gpm US 0 04 up to 0 12 gpm UK Flush the Erlenmeyer flask re peatedly in order to effectuate the sam pling removal ATTENTION see chapter Security Advices and Dan gers in Case o...

Страница 10: ...tions stated in the chapters In stallation and Maintenance have to be strictly observed 5 5 Service Interruption ATTENTION see chapter Security Advices and Dan gers in Case of Non compliance In the ca...

Страница 11: ...ich can lead to brittleness right up to brittle fractures These kinds of cleaners must therefore not be used 7 2 Indicating plate ATTENTION see chapter Security Advices and Dan gers in Case of Non com...

Страница 12: ...ended to aim at the main tenance works and the supply of the con sumer and wear parts being effected by the skilled handicraft or the manufacturer client service In the sense of our General Sales and...

Страница 13: ...recipient is made of plastic equipped with connections for the cool ing water inlet BSP R and outlet as well as for the sample water inlet BSP R sample water outlet heat ex changer made of stainless...

Страница 14: ...ete state Tranport damages have to be reported within twenty four hours due to the fact that unless for actuarial reasons any adjustment of claims can be effected Measuring instrument Order number Sul...

Страница 15: ...et tester 8690001 Buffer solution 8721098 Measuring instrument Order number Item Designation Piece Order No VE1 Piece 1 Retention Sieve 1 2460023 4 2 Clamp ring screw connection 1 1450255 7 3 Erlenmey...

Страница 16: ...eu JUDO France S r L 76 Rue de la Plaine des Bouchers Technosud F 67100 Strasbourg Tel 33 0 3 88 65 93 94 Fax 33 0 3 88 65 98 49 e mail info judo fr www judo fr Installed by JUDO HEIFI SOFT Mobile so...

Отзывы: