9.10 Maintenance
9.10.1 General
maintenance
To operate radar equipment constantly in a good condition, the following maintenance is necessary.
Maintain the equipment periodically. Periodic maintenance reduces failures.
The following common maintenance points are applied to each unit.
1. Cleaning the equipment
Remove dust, stains, and seawater from the cabinet as much as possible. Use a dry cloth for
cleaning.
2. Checking the tightening of screws
Check the tightening of screws of assembly and component setting crews that are used for the
equipment.
3. Checking connections
Check the cable connections between equipment units (scanner unit - processing unit,
processing unit - power, processing unit - keyboard unit, processing unit - display unit,
processing unit - optional equipment) if the equipment units are electrically connected.
Make sure that the main power is turned off before maintaining the equipment.In
particular, when a rectifier is used, a voltage is output from the rectifier even if the
power of the display is turned off and the radar is stopped.
If maintenance work is performed without turning off the main power, there is a risk
of equipments breaking down, and dying or getting a serious injury of any person
by electric shock.
Содержание JMA-5104
Страница 1: ...JMA 5104 5106 5110 MARINE RADAR EQUIPMENT INSTRUCTION MANUAL ...
Страница 14: ...IX EQUIPMENT APPEARANCE Scanner Unit Type NKE 2042 2 feet Scanner Unit Type NKE 2062 4 feet ...
Страница 15: ...X Scanner Unit Type NKE 2102 6 feet Processing Unit Type NDC 1260 ...
Страница 16: ...XI Display Unit Type NWZ 146 Landscape and Keyboard Unit NCE 7640 ...
Страница 17: ...XII Display Unit Type NWZ 146 Portrait and Keyboard Unit NCE 7640 ...
Страница 27: ......
Страница 31: ...4 1 4 Configuration Fig 1 1 OUTLINE DRAWING OF SCANNER UNIT NKE 2042 ...
Страница 32: ...5 Fig 1 2 OUTLINE DRAWING OF SCANNER UNIT NKE 2062 ...
Страница 33: ...6 Fig 1 3 OUTLINE DRAWING OF SCANNER UNIT NKE 2102 ...
Страница 34: ...7 Fig 1 4 OUTLINE DRAWING OF PROCESSING UNIT NDC 1260 ...
Страница 35: ...8 Fig 1 5 OUTLINE DRAWING OF KEYBOARD UNIT NCE 7640 ...
Страница 36: ...9 Fig 1 6 OUTLINE DRAWING OF DISPLAY UNIT NWZ 146 LANDSCAPE ...
Страница 37: ...10 Fig 1 7 OUTLINE DRAWING OF DISPLAY UNIT NWZ 146 PORTRAIT ...
Страница 142: ...115 9 2 3 Connection of cables to be assembled 1 Radome scanner unit NKE 2042 ...
Страница 144: ...117 2 Rotary scanner unit NKE 2062 NKE 2102 ...
Страница 145: ...118 ...
Страница 159: ...132 Method of assembling and connecting P3 LTWD06BFFA L180 and P5 LTWD08BFFA L180 that are attached ...
Страница 232: ... Fig 107 INTERNAL CONNECTION OF SCANNER UNIT NKE 2042 ...
Страница 233: ... Fig 108 INTERNAL CONNECTION OF SCANNER UNIT NKE 2062 ...
Страница 235: ... Fig 110 CIRCUIT DRAWING OF MODULATOR UNIT CME 322 ...
Страница 236: ... Fig 111 CIRCUIT DRAWING OF MODULATOR UNIT CME 323 ...
Страница 240: ... Fig 115 INTERNAL CONNECTION OF DISPLAY UNIT NCD 4310 ...
Страница 241: ... Fig 116 CIRCUIT DRAWING OF POWER SUPPLY UNIT CBD 1638 ...