
14 | Installation Instructions
Figure 6: Cable Preparation Sending Cable Sides
Note Always check the drawing for the correct shielding of signals.
1.1.8.2 Cable Preparation Receiving Sides
1. Remove approx. 80 mm of the plastic cable sheath, including the grounding shield.
2. Wrap insulating tape over the cable end.
Receiving Cable Sides on page 14.
Figure 7: Cable Preparation Receiving Cable Sides
Note Always check the drawing for the correct shielding of signals.
1.1.9 Grounding Instrument
To function properly, the AlphaLine instrument must be grounded to the ship’s mass.
For this purpose the instrument has a grounding bolt. Connect the grounding bolt to the ship’s mass with a low
impedance connection.
Содержание AlphaWind AlphaLine MFL
Страница 1: ...AlphaWind Wind Repeater Installation and Operation Manual www jrc am ...
Страница 29: ...29 Operation Figure 21 Alert Handling in Menu example ...
Страница 56: ...56 Appendix A 4 3 Mechanical Drawings 4 3 1 Mechanical Drawing MFM Figure 51 Mechanical Drawing MFM ...
Страница 57: ...57 Appendix A 4 3 2 Mechanical Drawing MFL Figure 52 Mechanical Drawing MFL ...
Страница 59: ...59 Appendix A 4 4 2 Connection Diagram AlphaWind Figure 54 Connection Diagram AlphaWind 1 ...
Страница 60: ...60 Appendix A Figure 55 Connection Diagram AlphaWind 2 ...
Страница 62: ...62 Appendix A 4 5 1 Schematics AlphaLine MF Display Unit Figure 56 Schematics AlphaLine MF Display Unit ...
Страница 63: ...63 Appendix A 4 5 2 Schematics AlphaLine Instrument Figure 57 Schematics AlphaLine Instrument ...