MODEL CC2

SPRINKLER

12" (305 mm)

MINIMUM

36" (915 mm)

MAXIMUM

1-1/2" (40 mm)

MINIMUM

4" (102 mm)

MAXIMUM

6" (152 mm)

MAXIMUM FOR

CPVC PIPE

FRAME ARMS OF

SPRINKLER MUST

BE INSTALLED

IN-LINE WITH

PIPE RUN

WHEN OFFSETTING CPVC PIPE OVER AN

OBSTRUCTION, A MODEL CC2 SPRINKLER

MUST BE INSTALLED DIRECTLY ON THE

CPVC PIPE OVER THE OBSTRUCTION

6" (152 mm) MAXIMUM ABOVE

CEILING TO BOTTOM OF PIPE OR

NON-COMBUSTIBLE CEILING INSULATION,

OR 1/3 THE DEPTH OF CONCEALED SPACE

(AS MEASURED FROM TOP SURFACE OF

CEILING TO BOTTOM OF DECK ABOVE),

WHICHEVER IS SMALLER

TOP CHORD

4" (102 mm)

OR LESS

4-1/2" (114 mm) MINIMUM

FROM FACE OF WOOD TRUSS

OR TOP CHORD OF BAR JOIST

CEILING

UPPER DECK

OBSTRUCTION

TOP OF CHORD

MODEL CC2

SPRINKLER

UPPER

DECK

NON-COMBUSTIBLE

INSULATION

1-1/2" (40 mm)

MINIMUM

6" (152 mm)

MAXIMUM FOR

CPVC PIPE

COMPOSITE

WOOD JOISTS

SOLID WOOD

JOISTS

FRAME ARMS OF

SPRINKLER MUST

BE INSTALLED

IN-LINE WITH

PIPE RUN

WHEN OFFSETTING CPVC PIPE OVER AN

OBSTRUCTION, A MODEL CC2 SPRINKLER

MUST BE INSTALLED DIRECTLY ON THE

CPVC PIPE OVER THE OBSTRUCTION

6" (152 mm) MAXIMUM ABOVE

CEILING TO BOTTOM OF PIPE OR

NON-COMBUSTIBLE CEILING INSULATION,

OR 1/3 THE DEPTH OF CONCEALED SPACE

(AS MEASURED FROM TOP SURFACE

OF CEILING TO BOTTOM SURFACE

OF JOIST INSULATION ABOVE),

WHICHEVER IS SMALLER

BOTTOM

OF PIPE

TOP OF

CHORD

12" (305 mm)

MINIMUM

36" (915 mm)

MAXIMUM

4" (102 mm)

MAXIMUM

OBSTRUCTION

CEILING

FIGURE 2 

UNOBSTRUCTED WOOD TRUSS CONSTRUCTION 

OR UNOBSTRUCTED BAR JOIST CONSTRUCTION 

CROSS SECTION ELEVATION VIEW 

CPVC PIPE

FIGURE 3 

NON-COMBUSTIBLE INSULATION-FILLED UPPER DECK 

SOLID WOOD OR COMPOSITE WOOD JOIST CONSTRUCTION 

CROSS SECTION ELEVATION VIEW 

CPVC PIPE

Содержание tyco CC2

Страница 1: ...n dard spray sprinklers by design have an umbrella like spray pattern that poses a difficult challenge when trying to achieve effective coverage within a shallow space The Model CC2 Com bustible Conce...

Страница 2: ...4 1 2 in 114 mm Remote Area CPVC Pipe The remote area is 1000 ft 93 m NOTE The remote area does not include any additional sprinklers required for pro tection of BLAZE MASTER CPVC that is offset over...

Страница 3: ...DECK NON COMBUSTIBLE INSULATION 1 1 2 40 mm MINIMUM 6 152 mm MAXIMUM FOR CPVC PIPE COMPOSITE WOOD JOISTS SOLID WOOD JOISTS FRAME ARMS OF SPRINKLER MUST BE INSTALLED IN LINE WITH PIPE RUN WHEN OFFSETT...

Страница 4: ...eatest and run parallel with the joist spaced at 31 ft 9 4 m width maximum to limit the area to a max imum of 1000 ft 93 m The draft curtain may be constructed of 1 4 in 6 4 mm plywood to prevent heat...

Страница 5: ...MAXIMUM CEILING UPPER DECK FRAME ARMS OF SPRINKLER MUST BE INSTALLED IN LINE WITH PIPE RUN UPPER DECK CEILING FRAMING 54 1372 mm MAXIMUM 2x FLOOR SOLID WOOD JOISTS 6 152 mm MINIMUM 36 915 mm MAXIMUM M...

Страница 6: ...915 mm MAXIMUM UPPER DECK MODEL CC2 SPRINKLER CEILING FRAMING 54 1372 mm MAXIMUM CEILING TOP CHORD GREATER THAN 4 102 mm IN DEPTH 6 152 mm MINIMUM 36 915 mm MAXIMUM FRAME ARMS OF SPRINKLER MUST BE INS...

Страница 7: ...e 9 for installation of the Model CC2 Sprinklers by applying the wrench to the sprinkler wrench flats only WRENCH RECESS USE END A ONLY 0 2 1 2 63 5 mm 3 1 2 88 9 mm 5 1 2 139 7 mm 7 1 2 190 5 mm 9 1...

Страница 8: ...should be replaced if they cannot be completely cleaned by wiping the sprinkler with a cloth or by brushing it with a soft bristle brush Care must be exercised to avoid damage to the sprinklers before...

Отзывы: