
IDC INDUCED DRAFT EVAPORATIVE CONDENSERS
INSTALLATION
S140-500 IOM (FEB 08)
Page 13
Figure 2-4a. Assembly and Placement
NO
TES:
1.
The hook of the cr
ane m
ust be a minim
um height
abo
v
e
the top of the section being lifted to pre
v
ent
e
xcessiv
e str
ain on the lifters
.
2.
Saf
ety slings and skidding should be remo
v
ed
bef
ore assemb
ling the sections together
.
3.
T
o
minimiz
e wind loads dur
ing e
xtended lifts
,
remo
v
e
the louv
ers
.