background image

6

19

Terminal Position

Min Distance

A

Directly below a window or other opening

300mm

B

Above roof level (to base of terminal)

300mm

C

From adjacent wall to flue

300mm

D

From internal corner to flue

400mm

E

From facing terminal

1200mm

F

Between terminals

300mm

G

Below eaves or balcony

NOT  RECOMMENDED

Fig. 6

Recommended (Vertical)

Terminal Positions

1

2

3

4

5

6

7

8

9

1

0

L

N

L

N

A

/H

C

O

M

W

/H

T

h

e

rm

is

ta

-

s

ta

t

T

h

erm

is

ta-

st

at

(S

up

pl

ie

d)

Po

la

ri

ty

no

t

im

por

ta

nt

E

x

te

rn

a

P

ro

g

ra

m

m

e

r

(N

o

t s

u

p

p

li

ed

)

E

c

o

n

o

m

a

ir

e

He

at

er

 hav

e v

ol

tag

e f

re

e

sw

it

c

h

in

g

 c

o

n

ta

c

ts

Mu

s

t

Te

s

t

Su

p

p

ly

Fu

s

e

 

T3

.1

5

A

23

0V

~5

0H

z

R

1

2

7

K

0

ON

  C

O

 OF

F

N

L1

234

5

6

A/

H TI

M

E

D

O/

P

Fig. 15

Schematic Diagram (showing connection of an external controller)

PART No

CONTENTS

COLOUR

1000-0016520

1 X 90° Standard Flue Elbow

White

1000-0016530

1 X 45° Flue Elbows

White

1000-0016550

1 X 500mm Extension

White

1000-0016540

1 X 1000mm Extension

White

1000-0016560

1 X Vertical Terminal
1 X Support Bracket

Anthracite

1000-0016630

1 X Vertical Terminal
1 X Support Bracket

Terracotta

1000-0014890

1 X Lead Pitched Roof Flashing
1 X Collar

Anthracite

1000-0014990

1 X Lead Pitched Roof Flashing
1 X Collar

Terracotta

1000-0014900

1 X Aluminium Flat Roof Flashing

Aluminium

1000-0016570

1 X Horizontal Wall Terminal

White

1000-0016580

1 X Wall Plates (for above)

White

1000-0016590

1 X Horizontal Wall Terminal

2 X Wall Plates

White

1000-0016600

1 X Condensation Drain

White

1000-0014950

1 X Syphon Kit (for above)

N/A

1000-0016610

1 X Condensation Drain
1 X Syphon Kit

N/A

1000-0016620

1 X Wall Bracket  (125mm dia)

N/A

1000-0017130

1 X Terminal Guard

N/A

Table 2.

Flue and Terminal Components

Содержание ECONOMAIRE 90

Страница 1: ...7a 1000 0705350 Cross light injector Bray Cat 10 110 1 8 E39538 BOS02397 1 Ignition burner assembly 1 9 1000 0522250 Air pressure switch 1 10 E69632 1000 0520830 Clock mechanism 1 11 1000 0708860 Igni...

Страница 2: ...partment should be not less than 75mm 3 in However if clearances are less than 75mm the internal surface of the compartment must be lined with non combustible material and the compartment must be of a...

Страница 3: ...low for ease of removal for access to the flue 4 1 5 All duct work in the room or internal space in which the heater is installed shall be mechanically secured and sealed with ducting tape 4 2 WARM DE...

Страница 4: ...1 11 Where the total flue length exceeds these lengths the flue orifice MUST be removed 5 1 12 The heater is supplied with either a horizontal or vertical flue dependant upon your specification when...

Страница 5: ...minal positions 5 3 7 Reference should be made to Table 2 for the required terminal components Fig 16 ECONOMAIRE90 PrincipalDimensions SIDE VIEW PLAN VIEW FRONT VIEW BASE VIEW KNOCKOUT FOR GAS ENTRY B...

Страница 6: ...NTS COLOUR 1000 0016520 1 X 90 Standard Flue Elbow White 1000 0016530 1 X 45 Flue Elbows White 1000 0016550 1 X 500mm Extension White 1000 0016540 1 X 1000mm Extension White 1000 0016560 1 X Vertical...

Страница 7: ...pipe from the meter is to be preferred wherever possible Where this is not possible the pipe must be capable of taking the complete input of the heater and all other gas appliances being served by th...

Страница 8: ...imal point DP in the bottom right hand corner of the LED display will flash continuously 6 3 8 The igniter will spark for a maximum period of 60 seconds during which time the ignition and main burners...

Страница 9: ...0 seconds 6 6 10 Depress the RESET button on the Indicator Panel 6 6 11 The heater will go through its ignition procedure and the ignition and main burners SHOULD ignite 6 6 12 Set the AIR HEATER swit...

Страница 10: ...3 Burner Pressure Adjuster 4 Ignition Controller A Side view photograph With Ignition Controller in place B Rear view drawing With Ignition Controller removed 1 2 3 4 1 3 2 1 4 3 2 500 0 23 mbar 0 625...

Страница 11: ...as a complete unit together with the multifunction control PROCEDURE 8 2 1 Ensure that the gas and electrical supplies are switched OFF 8 2 2 Remove the front door from the heater 8 2 3 Remove the fix...

Страница 12: ...the electrical supply is isolated 8 7 2 Remove the appliance front door and release the 3 x securing screws on the electrical door assembly 8 7 3 Open the door assembly outwards on its hinges see fig...

Страница 13: ...the electrical supply is isolated 8 7 2 Remove the appliance front door and release the 3 x securing screws on the electrical door assembly 8 7 3 Open the door assembly outwards on its hinges see fig...

Страница 14: ...as a complete unit together with the multifunction control PROCEDURE 8 2 1 Ensure that the gas and electrical supplies are switched OFF 8 2 2 Remove the front door from the heater 8 2 3 Remove the fix...

Страница 15: ...3 Burner Pressure Adjuster 4 Ignition Controller A Side view photograph With Ignition Controller in place B Rear view drawing With Ignition Controller removed 1 2 3 4 1 3 2 1 4 3 2 500 0 23 mbar 0 625...

Страница 16: ...0 seconds 6 6 10 Depress the RESET button on the Indicator Panel 6 6 11 The heater will go through its ignition procedure and the ignition and main burners SHOULD ignite 6 6 12 Set the AIR HEATER swit...

Страница 17: ...imal point DP in the bottom right hand corner of the LED display will flash continuously 6 3 8 The igniter will spark for a maximum period of 60 seconds during which time the ignition and main burners...

Страница 18: ...pipe from the meter is to be preferred wherever possible Where this is not possible the pipe must be capable of taking the complete input of the heater and all other gas appliances being served by th...

Страница 19: ...NTS COLOUR 1000 0016520 1 X 90 Standard Flue Elbow White 1000 0016530 1 X 45 Flue Elbows White 1000 0016550 1 X 500mm Extension White 1000 0016540 1 X 1000mm Extension White 1000 0016560 1 X Vertical...

Страница 20: ...minal positions 5 3 7 Reference should be made to Table 2 for the required terminal components Fig 16 ECONOMAIRE90 PrincipalDimensions SIDE VIEW PLAN VIEW FRONT VIEW BASE VIEW KNOCKOUT FOR GAS ENTRY B...

Страница 21: ...1 11 Where the total flue length exceeds these lengths the flue orifice MUST be removed 5 1 12 The heater is supplied with either a horizontal or vertical flue dependant upon your specification when...

Страница 22: ...low for ease of removal for access to the flue 4 1 5 All duct work in the room or internal space in which the heater is installed shall be mechanically secured and sealed with ducting tape 4 2 WARM DE...

Страница 23: ...partment should be not less than 75mm 3 in However if clearances are less than 75mm the internal surface of the compartment must be lined with non combustible material and the compartment must be of a...

Страница 24: ...7a 1000 0705350 Cross light injector Bray Cat 10 110 1 8 E39538 BOS02397 1 Ignition burner assembly 1 9 1000 0522250 Air pressure switch 1 10 E69632 1000 0520830 Clock mechanism 1 11 1000 0708860 Igni...

Отзывы: