background image

5

20

5.3

VERTICAL TERMINAL LOCATION:

5.3.1

The ECONOMAIRE 90 is designed
to be used with a vertical flue where
the installation of a horizontal flue
is either not possible or not desired.

5.3.2

Installation of a vertical flue can be
achieved on either a flat or pitched
roof with a pitch angle of between
25

o

 and 50

o

.

5.3.3

The terminal MUST be positioned on the outside of the building and allow for the free passage of air across it at ALL
times.

5.3.4

Avoid positions where the terminal is adjacent to projections; particularly under a balcony.

5.3.5

The terminal position must ensure that combustion products cannot enter the building in which the heater is installed
(or any adjacent building) through windows, doors or by any other means.

5.3.6

Fig. 6 shows recommended terminal positions.

5.3.7

Reference should be made to Table 2 for the required terminal components.

Fig. 16

ECONOMAIRE 90 - Principal Dimensions

SIDE VIEW

PLAN VIEW

FRONT VIEW

BASE VIEW

KNOCKOUT FOR

GAS  ENTRY

(BOTH SIDES)

UNUSED

KNOCKOUT 

(BOTH SIDES)

ELECTRICAL 

ENTRY

UNUSED

 KNOCKOUT 

(BOTH SIDES)

42.5

42.5

400

485

242.5

13

18

14

05

83

2

71

6

290

525

528

615

448

25

40

1

80

15

25

Terminal Position

Min Distance

A

Directly above or below a window or other opening

300mm

B

Below gutters, soil pipes or drain pipes

75mm

C

Below eaves

200mm

D

Below balcony

200mm

E

From vertical drain/soil pipes

150mm

F

From internal or external corners

300mm

G

Above ground or balcony level

300mm

H

From a surface facing terminal

600mm

I

From a terminal facing a terminal

1200mm

J

Vertically from a terminal on the same wall

1500mm

K

Horizontally from a terminal on the same wall

300mm

Fig.4

Recommended (Horizontal)

Terminal Positions

220mm

Outer Tube

Flue Tube

Wall

Plate

Plate

Fig. 5

Horizontal Flue Terminal

Содержание ECONOMAIRE 90

Страница 1: ...7a 1000 0705350 Cross light injector Bray Cat 10 110 1 8 E39538 BOS02397 1 Ignition burner assembly 1 9 1000 0522250 Air pressure switch 1 10 E69632 1000 0520830 Clock mechanism 1 11 1000 0708860 Igni...

Страница 2: ...partment should be not less than 75mm 3 in However if clearances are less than 75mm the internal surface of the compartment must be lined with non combustible material and the compartment must be of a...

Страница 3: ...low for ease of removal for access to the flue 4 1 5 All duct work in the room or internal space in which the heater is installed shall be mechanically secured and sealed with ducting tape 4 2 WARM DE...

Страница 4: ...1 11 Where the total flue length exceeds these lengths the flue orifice MUST be removed 5 1 12 The heater is supplied with either a horizontal or vertical flue dependant upon your specification when...

Страница 5: ...minal positions 5 3 7 Reference should be made to Table 2 for the required terminal components Fig 16 ECONOMAIRE90 PrincipalDimensions SIDE VIEW PLAN VIEW FRONT VIEW BASE VIEW KNOCKOUT FOR GAS ENTRY B...

Страница 6: ...NTS COLOUR 1000 0016520 1 X 90 Standard Flue Elbow White 1000 0016530 1 X 45 Flue Elbows White 1000 0016550 1 X 500mm Extension White 1000 0016540 1 X 1000mm Extension White 1000 0016560 1 X Vertical...

Страница 7: ...pipe from the meter is to be preferred wherever possible Where this is not possible the pipe must be capable of taking the complete input of the heater and all other gas appliances being served by th...

Страница 8: ...imal point DP in the bottom right hand corner of the LED display will flash continuously 6 3 8 The igniter will spark for a maximum period of 60 seconds during which time the ignition and main burners...

Страница 9: ...0 seconds 6 6 10 Depress the RESET button on the Indicator Panel 6 6 11 The heater will go through its ignition procedure and the ignition and main burners SHOULD ignite 6 6 12 Set the AIR HEATER swit...

Страница 10: ...3 Burner Pressure Adjuster 4 Ignition Controller A Side view photograph With Ignition Controller in place B Rear view drawing With Ignition Controller removed 1 2 3 4 1 3 2 1 4 3 2 500 0 23 mbar 0 625...

Страница 11: ...as a complete unit together with the multifunction control PROCEDURE 8 2 1 Ensure that the gas and electrical supplies are switched OFF 8 2 2 Remove the front door from the heater 8 2 3 Remove the fix...

Страница 12: ...the electrical supply is isolated 8 7 2 Remove the appliance front door and release the 3 x securing screws on the electrical door assembly 8 7 3 Open the door assembly outwards on its hinges see fig...

Страница 13: ...the electrical supply is isolated 8 7 2 Remove the appliance front door and release the 3 x securing screws on the electrical door assembly 8 7 3 Open the door assembly outwards on its hinges see fig...

Страница 14: ...as a complete unit together with the multifunction control PROCEDURE 8 2 1 Ensure that the gas and electrical supplies are switched OFF 8 2 2 Remove the front door from the heater 8 2 3 Remove the fix...

Страница 15: ...3 Burner Pressure Adjuster 4 Ignition Controller A Side view photograph With Ignition Controller in place B Rear view drawing With Ignition Controller removed 1 2 3 4 1 3 2 1 4 3 2 500 0 23 mbar 0 625...

Страница 16: ...0 seconds 6 6 10 Depress the RESET button on the Indicator Panel 6 6 11 The heater will go through its ignition procedure and the ignition and main burners SHOULD ignite 6 6 12 Set the AIR HEATER swit...

Страница 17: ...imal point DP in the bottom right hand corner of the LED display will flash continuously 6 3 8 The igniter will spark for a maximum period of 60 seconds during which time the ignition and main burners...

Страница 18: ...pipe from the meter is to be preferred wherever possible Where this is not possible the pipe must be capable of taking the complete input of the heater and all other gas appliances being served by th...

Страница 19: ...NTS COLOUR 1000 0016520 1 X 90 Standard Flue Elbow White 1000 0016530 1 X 45 Flue Elbows White 1000 0016550 1 X 500mm Extension White 1000 0016540 1 X 1000mm Extension White 1000 0016560 1 X Vertical...

Страница 20: ...minal positions 5 3 7 Reference should be made to Table 2 for the required terminal components Fig 16 ECONOMAIRE90 PrincipalDimensions SIDE VIEW PLAN VIEW FRONT VIEW BASE VIEW KNOCKOUT FOR GAS ENTRY B...

Страница 21: ...1 11 Where the total flue length exceeds these lengths the flue orifice MUST be removed 5 1 12 The heater is supplied with either a horizontal or vertical flue dependant upon your specification when...

Страница 22: ...low for ease of removal for access to the flue 4 1 5 All duct work in the room or internal space in which the heater is installed shall be mechanically secured and sealed with ducting tape 4 2 WARM DE...

Страница 23: ...partment should be not less than 75mm 3 in However if clearances are less than 75mm the internal surface of the compartment must be lined with non combustible material and the compartment must be of a...

Страница 24: ...7a 1000 0705350 Cross light injector Bray Cat 10 110 1 8 E39538 BOS02397 1 Ignition burner assembly 1 9 1000 0522250 Air pressure switch 1 10 E69632 1000 0520830 Clock mechanism 1 11 1000 0708860 Igni...

Отзывы: