26 of 76
7.5 CABLE TO TOWER INSTALLATION
1. Assemble each cable to the top plate of their respective towers. Secure in place
with 7/8" washer and two 7/8" hex nuts. See
Figure 17
.
Note: During leveling of the lift (see
Section 6.11
), optional 1" and 2" spacers
have been included to allow for more adjustment.
Figure 17. Cable routing diagram
Содержание ALIGNMENT 44218Q
Страница 8: ...8 of 76 SAVE THESE INSTRUCTIONS 2 1 SAFETY WARNING LABELS SAVE THESE INSTRUCTIONS ...
Страница 13: ...13 of 76 6 1 TYPICAL BAY LAYOUT ...
Страница 15: ...15 of 76 Figure 3 Chalk line layout ...
Страница 44: ...44 of 76 10 2 MAINTENANCE RECORDS Maintenance and Training Performed Date By Notes ...
Страница 57: ...57 of 76 12 0 PARTS LIST 12 1 LIFT ASSEMBLY ...
Страница 59: ...59 of 76 12 3 TOWER ASSEMBLY ...
Страница 61: ...61 of 76 12 5 DECK ASSEMBLY LEFT SIDE ...
Страница 63: ...63 of 76 12 7 CROSSMEMBER ASSEMBLY ...
Страница 65: ...65 of 76 12 9 CYLINDER ASSEMBLY ...
Страница 67: ...67 of 76 12 11 HYDRAULIC AND AIR KIT ...
Страница 70: ...70 of 76 12 14CABLE ROUTING ...
Страница 72: ...72 of 76 12 16POWER PACK ASSEMBLY ...
Страница 76: ...76 of 76 REVISIONS 08 17 2021 Safety Requirements for Installation added Outdoor Installs are Prohibited ...