25 of 76
7.4 INSTALLATION OF TOWERS
1. Remove the slider block weldments from both crossmembers by removing the
3/8”-16UNC x 1”LG Hex HD Bolts and 3/8” lock washers attaching them to the
crossmember. See
Figure 16.
2. Determine which tower is the power post (see
Figure 4
) and position it in the
front left corner. Position the remaining three towers at the other corners of the
lift.
3. Slide each tower around the crossmember so that the holes for attaching the
slider blocks are roughly halfway inside the channel.
Figure 16. Tower Installation
4. Place the Glide Bearings (located in the accessory box) on the slider block
weldments and bolt the slider block weldments back onto the crossmember using
the 3/8”-16UNC x 1”LG Hex HD Bolts and 3/8” lock washers removed previously.
5. Pull the towers backwards (away from the decks) so that the slider blocks are
contacting the inside of the tower.
6. Repeat for remaining towers.
Содержание ALIGNMENT 44218Q
Страница 8: ...8 of 76 SAVE THESE INSTRUCTIONS 2 1 SAFETY WARNING LABELS SAVE THESE INSTRUCTIONS ...
Страница 13: ...13 of 76 6 1 TYPICAL BAY LAYOUT ...
Страница 15: ...15 of 76 Figure 3 Chalk line layout ...
Страница 44: ...44 of 76 10 2 MAINTENANCE RECORDS Maintenance and Training Performed Date By Notes ...
Страница 57: ...57 of 76 12 0 PARTS LIST 12 1 LIFT ASSEMBLY ...
Страница 59: ...59 of 76 12 3 TOWER ASSEMBLY ...
Страница 61: ...61 of 76 12 5 DECK ASSEMBLY LEFT SIDE ...
Страница 63: ...63 of 76 12 7 CROSSMEMBER ASSEMBLY ...
Страница 65: ...65 of 76 12 9 CYLINDER ASSEMBLY ...
Страница 67: ...67 of 76 12 11 HYDRAULIC AND AIR KIT ...
Страница 70: ...70 of 76 12 14CABLE ROUTING ...
Страница 72: ...72 of 76 12 16POWER PACK ASSEMBLY ...
Страница 76: ...76 of 76 REVISIONS 08 17 2021 Safety Requirements for Installation added Outdoor Installs are Prohibited ...