55 of 76
PNEUMATIC
UPTO 160PSI
SLOWLY CLOSE LOCKOUT
VALVE TO RELEASE AIR
PRESSURE GRADUALLY.
ATTACH MULTIPLE LOCKOUT
DEVICE, LOCK AND TAG.
DANGER: LINE SIDE OF
DISCONNECT REMAINS
PRESSURIZED
VERIFY THE VALVE IS
CLOSED AND LOCKOUT
DEVICE IS PROPERLY
ATTACHED. OPERATE THE
PNEUMATIC SYSTEM TO
ENSURE THE SYSTEM IS DE-
ENERGIZED. IT MAY BE
NECESSARY TO BLEED THE
SYSTEM OF REMAINING
COMPRESSED AIR, THIS CAN
BE PERFORMED AT THE
BASE OF THE WATER
SEPARATOR BOWL.
- RETURNING TO SERVICE:
Check the lift and the immediate area around the lift to ensure that nonessential
items,, tools and parts are removed and that the lift components are operationally
intact.
Check the work area to ensure that all employees have been safely positioned or
removed from the work area.
Notify all employees that the lockout/tagout is going to be removed and the lift is
going to restarted.
Remove the lockout/tagouts in the reverse order as the installation.
Verify the proper operation of the equipment.
Notify affected employees that the maintenance/service is completed and the
machine is ready for operation.
11.2 EMERGENCY OPERATION
If the lift becomes inoperative in the raised position, it is best to wait until the electrical
power is restored before lowering the vehicle. However, if it’s critical to safety that the lift
be lowered, the following steps should be taken.
NOTE: Safely performing this process requires 3 people. All personnel should
stay clear of the path of the lift. All tools and other non-secured items should be
removed from the surface of the ruways.
1) Survey the area surrounding the lift; remove any items and personnel from area
before proceeding with this procedure.
2) Perform the appropriate lockout/tag out procedure on the electrical energy.
3) Add additional chocks to the vehicle to secure it from movement in the forward
and rear direction.
WARNING: DO NOT LOOSEN OR REMOVE HYDRAULIC CONNECTIONS OR
FITTINGS UNDER PRESSURE. SERIOUS INJURY OR DEATH COULD OCCUR.
Содержание ALIGNMENT 44218Q
Страница 8: ...8 of 76 SAVE THESE INSTRUCTIONS 2 1 SAFETY WARNING LABELS SAVE THESE INSTRUCTIONS ...
Страница 13: ...13 of 76 6 1 TYPICAL BAY LAYOUT ...
Страница 15: ...15 of 76 Figure 3 Chalk line layout ...
Страница 44: ...44 of 76 10 2 MAINTENANCE RECORDS Maintenance and Training Performed Date By Notes ...
Страница 57: ...57 of 76 12 0 PARTS LIST 12 1 LIFT ASSEMBLY ...
Страница 59: ...59 of 76 12 3 TOWER ASSEMBLY ...
Страница 61: ...61 of 76 12 5 DECK ASSEMBLY LEFT SIDE ...
Страница 63: ...63 of 76 12 7 CROSSMEMBER ASSEMBLY ...
Страница 65: ...65 of 76 12 9 CYLINDER ASSEMBLY ...
Страница 67: ...67 of 76 12 11 HYDRAULIC AND AIR KIT ...
Страница 70: ...70 of 76 12 14CABLE ROUTING ...
Страница 72: ...72 of 76 12 16POWER PACK ASSEMBLY ...
Страница 76: ...76 of 76 REVISIONS 08 17 2021 Safety Requirements for Installation added Outdoor Installs are Prohibited ...