20 of 40
3.
Using a rotary hammer drill and a 1/2” concrete bit, drill through the floor at each of the
six (6) anchor bolt locations on each of the base frames. Make sure that the 1/2” concrete
drill bit is in good condition. Refer to Figure 9.
4.
Assemble the nut and washer onto the 1/2” x 4 1/2” long wedge anchor bolts supplied. A
minimum of six threads must be visible below the surface of the nut.
5.
Clean out the drilling dust from the holes and hammer in the anchors until they make
contact with the baseplate.
Hand tighten all anchor bolts
.
6.
Torque all anchor bolts to 55 ft-lbs.
7.
Position the console in the final desired location. Using a rotary hammer drill and a 1/4”
concrete bit, drill and anchor the console to the floor using the Nail in Anchors located in
the hardware kit.
8.
Use the line covers to protect all cables, hoses, and wiring running to the lift. Using a
rotary hammer drill and a ¼” concrete bit, drill and anchor the line covers using the nail
in anchors located in the hardware kit.
9.
With all anchor bolts torqued as specified operate the lift checking its full operation.
If anchor bolts do not tighten to 55 ft-lbs. OR project more than 2 ¼” above the concrete
surface, the concrete should be replaced by an appropriate concrete pad. (Consult Product
Manufacturer / Supplier for further details
Содержание 48109B
Страница 12: ...12 of 40 Hydraulic Schematic ...
Страница 28: ...28 of 40 11 PARTS MANUAL 11 1 BAYSAVER ASSEMBLY ...
Страница 31: ...31 of 40 11 3 BAYSAVER HYDRAULICS ...
Страница 33: ...33 of 40 11 5 BAYSAVER OPTIONS ...
Страница 35: ...35 of 40 11 7 BAYSAVER CONSOLE ...
Страница 37: ...37 of 40 11 9 9000 LB BAYSAVER POWERPACK ...
Страница 39: ...39 of 40 11 12 12 000 LB BAYSAVER POWER PACK PARTS LIST ...