10 of 40
recommended that the user provides additional overhead clearance or a shut off mechanism to
stop the lift from raising the vehicle too high.
1.
After selecting the location best suited for your lift, draw a line parallel to the front of the lift,
approximately 72” (1829mm) back from the cabinet/work bench area. This will be the
approximate location of the front of the lift.
NOTE:
Check the installation area for obstructions. (Overhead; light fixtures, heating ducts,
ceiling, and In-ground; floor drains, electrical, etc.)
2.
Mark on the floor an outline matching the dimensions listed.
144” (3658mm) W/B
Overall dimensions are 234" (5944mm) x 84" (2134mm).
172” (4369mm) W/B 9K
Overall dimensions are 264" (6706mm) x 84" (2134mm).
172” (4369mm) W/B 12K
Overall dimensions are 264" (6706mm) x 92" (2337mm).
3.
Draw a center line down the middle of the outline starting at the front of the lift location and
ending at the rear approach ramps.
4.
Draw two lines parallel to the centerline 18” (457mm), 9000 lb. / 20” (508mm), 12000 lb., on
either side to locate the inside of the baseframes.
5.
Draw a line parallel to the front of the lift or pit (flushmount) and align the front of each base
frame assembly onto this line.
144” (3658mm) W/B
39” (991mm) back from the front of the lift
172” (4369mm) W/B
49” (1321mm) back from the front of the lift
6.
Check the floor in the outline for the highest point using a four (4) foot level. Mark this
location, reference will be made to it later during the leveling procedure.
6.2
UNPACKING PROCEDURE
Cut and remove the metal banding straps that hold the accessory box (and sliding Jack Beams if
so equipped) and place in a convenient location near the installation area.
Cut and remove the metal banding straps surrounding the Two Main Frame Assemblies.
Position the Main Frame Assemblies in the location previously marked in the bay layout.
NOTE:
To distinguish between the left and right Main Frame Assemblies, ensure that the jack
beam rails should be facing each other. All measurements are to be taken from the front
of the lift.
Check that the inside of the base frames are 18" (457mm) away from the center line at both the
front and rear of each mainframe assembly and that the front of each base frame is on the line
drawn in step 5 of the bay layout Section 6.1.
Unpack Control Console and locate in the selected position best suited for the power pack, keep
in mind; that the location is restricted by the length of the hydraulic hose 21’(6401mm), and the
hydraulic inlet is on the Left Side of the Left Main Frame Assembly
Содержание 48109B
Страница 12: ...12 of 40 Hydraulic Schematic ...
Страница 28: ...28 of 40 11 PARTS MANUAL 11 1 BAYSAVER ASSEMBLY ...
Страница 31: ...31 of 40 11 3 BAYSAVER HYDRAULICS ...
Страница 33: ...33 of 40 11 5 BAYSAVER OPTIONS ...
Страница 35: ...35 of 40 11 7 BAYSAVER CONSOLE ...
Страница 37: ...37 of 40 11 9 9000 LB BAYSAVER POWERPACK ...
Страница 39: ...39 of 40 11 12 12 000 LB BAYSAVER POWER PACK PARTS LIST ...