LIFTING & TRANSPORTING
Section 1
Page 1-22
1001206597
METRO-LED
TRANSPORTING MACHINE
Transport Procedure
USE ONLY THE SPECIFIED TIE DOWN
POINTS TO STRAP MACHINE TO THE
TRANSPORT BED. DO NOT WINCH
MACHINE ONTO A TILT TRAY BED.
ENSURE THAT NO PART OF THE
MACHINE OVERHANGS ANY EDGE OF
THE TRANSPORT BED.
Forklift or Crane the machine onto the
transport bed ensuring that no part of the
machine overhangs the transport platform.
Wind down the four outrigger jack-legs so
that the feet just contact the transport bed.
Attach a ratchet-type strap/chain to the
edge of the transport bed. Thread the
strap/chain through the tie down point
provided and fasten to the transport bed.
Remove any slack in the strap/chain via
the ratchet mechanism or employ the use
of a dog-chain tensioner.
Repeat this tensioning on all four chains.
Secure the jack handle to prevent possible
unwinding of the outrigger.
If required the lighting tower can
positioned and secured lengthways across
the trailer deck by unpinning the folding
drawbar as shown.
!