SECTION 7 - GENERAL SPECIFICATIONS & OPERATOR MAINTENANCE
3121716
7-21
2.
Tighten nuts in the following sequence:
3.
The tightening of the nuts should be done in stages. Follow-
ing the recommended sequence, tighten nuts per wheel
torque chart.
4.
Wheel nuts should be torqued after first 50 hours of operation
and after each wheel removal. Check torque every 3 months or
150 hours of operation.
Table 7-12. Wheel Torque Chart
TORQUE SEQUENCE
1st Stage
2nd Stage
3rd Stage
40 ft. lbs.
(55 Nm)
100 ft. lbs.
(130 Nm)
170 ft. lbs.
(255 Nm)
To
order
go
to
Discount-Equipment.com
Содержание E400A Narrow
Страница 28: ...SECTION 1 SAFETY PRECAUTIONS 1 14 3121716 NOTES T o o r d e r g o t o D i s c o u n t E q u i p m e n t c o m...
Страница 97: ...SECTION 4 MACHINE OPERATION 4 36 3121716 NOTES T o o r d e r g o t o D i s c o u n t E q u i p m e n t c o m...
Страница 102: ...SECTION 5 EMERGENCY PROCEDURES 5 4 3121716 NOTES T o o r d e r g o t o D i s c o u n t E q u i p m e n t c o m...
Страница 107: ...SECTION 6 ACCESSORIES 6 4 3121716 NOTES T o o r d e r g o t o D i s c o u n t E q u i p m e n t c o m...
Страница 132: ...T o o r d e r g o t o D i s c o u n t E q u i p m e n t c o m...