SECTION 3 - CHASSIS & SCISSOR ARMS
3-24
– JLG Sizzor –
3121133
28. Press bearing on drive shaft.
29. Install shaft in supporting axle (1). Put in simulation
ring (2). Mount bearing with port plate , fix with 2
screws (3)
30. Place measuring device. Ascertain tolerance. Grip
shaft with Seeger ring pincers and move up and
down. [Simulation ring 1mm + tol (bearing
pretension 0.05 - 0.08) is resulting in thickness of the
synchronizing disc]. Grind synchronizing disc to
dimension.
1
2
3
Property of American Airlines
Содержание 3394RT
Страница 2: ...P r o p e r t y o f A m e r i c a n A i r l i n e s...
Страница 26: ...SECTION 1 SPECIFICATIONS 1 16 JLG Sizzor 3121133 NOTES P r o p e r t y o f A m e r i c a n A i r l i n e s...
Страница 124: ...SECTION 3 CHASSIS SCISSOR ARMS 3 88 JLG Sizzor 3121133 NOTES P r o p e r t y o f A m e r i c a n A i r l i n e s...
Страница 178: ...SECTION 5 JLG CONTROL SYSTEM 5 24 JLG Lift 3121133 NOTES P r o p e r t y o f A m e r i c a n A i r l i n e s...
Страница 227: ...P r o p e r t y o f A m e r i c a n A i r l i n e s...