SECTION 3 - CHASSIS & SCISSOR ARMS
3-14
– JLG Sizzor –
3121133
c. Secure the gears with new Snap Rings (12).
NOTE:
Heat
Supporting Ring (6)
up to approximately
189.5°F/70°C in a heating furnace.
3.
Insert outer rings into heated Supporting Ring (6).
(check for proper axial seat)
4.
Coat bore in Supporting Ring (6) with Loctite 573 for
Radial Shaft Seal Ring (17).
5.
Insert the bottom part of the double Tapered Roller
Bearing (11).
6.
Insert radial Shaft Seal Ring (17) into Supporting
Ring (6) and fill mounting space between sealing
lips with roller bearing grease.
NOTE:
Observe correct mounting position of sealing lip prior
to installing the seal ring.
7.
Install preassembled supporting ring onto Spindle
(34).
Property of American Airlines
Содержание 3394RT
Страница 2: ...P r o p e r t y o f A m e r i c a n A i r l i n e s...
Страница 26: ...SECTION 1 SPECIFICATIONS 1 16 JLG Sizzor 3121133 NOTES P r o p e r t y o f A m e r i c a n A i r l i n e s...
Страница 124: ...SECTION 3 CHASSIS SCISSOR ARMS 3 88 JLG Sizzor 3121133 NOTES P r o p e r t y o f A m e r i c a n A i r l i n e s...
Страница 178: ...SECTION 5 JLG CONTROL SYSTEM 5 24 JLG Lift 3121133 NOTES P r o p e r t y o f A m e r i c a n A i r l i n e s...
Страница 227: ...P r o p e r t y o f A m e r i c a n A i r l i n e s...