SECTION 4 - HYDRAULICS
3121133
– JLG Lift –
4-19
4.14 POWER DECK SANDWICH VALVE
4.15 POWER DECK MANIFOLD VALVE
NOTE:
Power Deck Manifold Valve is located on the under-
side of the platform. Dual extension decks are
equipped with two Manifold Valves. Single extension
decks have only one Manifold Valve.
1
2
P1
ET
P
LP
ET
EP
Figure 4-22. Power Deck Sandwich Valve (Dual Deck Extension Only)
item #
Torque
1
30 - 35 ft-lbs
(41 - 47 Nm)
2
25 - 30 ft-lbs
(34 - 41 Nm)
Power Deck (Optional)
EPR
EPB
ET
EP
SET AT 1500 PSI
EPB
EPR
M
EP
ET
EPB
EPR
M
EPR
EPB
Figure 4-23. Power Deck Manifold Valve
Port(s)
Torque
EP, ET
24 ft-lbs (32.5 Nm)
EPR, EPB
32 ft-lbs (43.4 Nm)
Property of American Airlines
Содержание 3394RT
Страница 2: ...P r o p e r t y o f A m e r i c a n A i r l i n e s...
Страница 26: ...SECTION 1 SPECIFICATIONS 1 16 JLG Sizzor 3121133 NOTES P r o p e r t y o f A m e r i c a n A i r l i n e s...
Страница 124: ...SECTION 3 CHASSIS SCISSOR ARMS 3 88 JLG Sizzor 3121133 NOTES P r o p e r t y o f A m e r i c a n A i r l i n e s...
Страница 178: ...SECTION 5 JLG CONTROL SYSTEM 5 24 JLG Lift 3121133 NOTES P r o p e r t y o f A m e r i c a n A i r l i n e s...
Страница 227: ...P r o p e r t y o f A m e r i c a n A i r l i n e s...