Dismantling/Setup/Commissioning
11/2021
1027959-00A
Operating instructions – 29/70
2.2
Assembly
WARNING!
Danger of hand injuries!
–
Wear protective gloves during assembly work to avoid
injuries.
–
Adjust the right-hand foot at the feet end or the right-
hand foot at the head end.
The foot adjustment process is complete when all
four feet sit evenly on the floor.
–
Position the scratch guard.
–
Align the mountings so they are horizontal.
This step must be performed by two people!
–
Carefully place the canopy’s sickle into the mountings
on the base.