Dismantling/Setup/Commissioning
24/70
2
Dismantling/Setup/Commissioning
Two people are needed to dismantle and set up the unit.
NOTE:
In the event of damage, JK-International GmbH shall as-
sume no liability if the damage is caused by improper setup!
Please read these instructions carefully before setup and
follow all the steps.
Setup tools needed:
4 mm hex socket (included in the scope of delivery)
Safety gloves
Flat-head screwdriver
Scissors or cutter
–
Use a screwdriver to carefully lift up the catch on the
connector.
–
Remove the mains plug.
NOTE:
The connector on the mains power cable must be discon-
nected only when the unit has been setup.
–
Use a screwdriver to carefully lift up the catch on the
connector.
This plug connects the canopy to the base.
–
Pull out the plug.
NOTE:
The plug on the connection cable must be disconnected only
when the unit has been setup.