18
KI-OM-0591 Rev 3
Operations
Figure 5 General Arrangement
3.4
Operating Start-Up Procedure
1
Carry out pre-operation checks on the following:
• Machinery is secure – No damage to mountings, brackets, pipe connections etc.
• Belt drive – In a good condition, belts correctly tensioned and belt guard secure.
• Pipe work and valves – Secure with no leaks.
• Filter units – Check that clean cartridges are fitted to the units
• Water supply and drain – Drain line unrestricted and supply operating correctly.
• Electrical connections – Electrical fittings and cables are secure and undamaged.
• Switches – Electrical breakers and isolator are switched to the on position.
• Emergency switch – Check that the switch is de-activated
2
Open the sea water supply valve and allow water to flow through the system.
Note
If the indicated pressure drop across the inlet filters exceeds 1 bar the filter
cartridge may need to be changed to maintain optimum performance.
3
Check the inlet water temperature and determine the required temperature rise as
outlined in section 3.2.
4
Press the pump start button.
Note
The pump should start and no fault indicator lights should be illuminated. If any
faults are present refer to Chapter 5 for troubleshooting.
5
Enter the required outlet temperature into the controller as the control set point value
(SV). (See 2.5
step 5.)
6
Turn on the appropriate heater banks as deduced in the procedure outlined in
section 3.2.
Содержание WHE - 3
Страница 2: ......
Страница 6: ...vi KI OM 0591 Rev 3 Intentionally blank ...
Страница 8: ...viii KI OM 0591 Rev 3 Intentionally blank ...
Страница 46: ...38 KI OM 0591 Rev 3 Part Identification Intentionally blank ...
Страница 56: ...B 2 KI OM 0591 Rev 3 Intentionally blank ...
Страница 60: ...C 4 KI OM 0591 Rev 3 WWHE 3 Electrical Schematic 24 VDC Control Circuit With Remote Sheet 1 of 2 ...
Страница 61: ...KI OM 0591 Rev 3 C 5 Sheet 2 of 2 ...
Страница 62: ...C 6 KI OM 0591 Rev 3 WHE 3 Electrical Schematic 440 V Heater Circuit With Remote ...
Страница 63: ...KI OM 0591 Rev 3 C 7 WHE 3 Electrical Schematic With Remote Busbar Manufacturing Detail ...
Страница 64: ...C 8 KI OM 0591 Rev 3 Schematic Water Heater Electric WHE 3 Upgrade With PV S 3 1 Cert Sheet 1 of 2 ...
Страница 65: ...KI OM 0591 Rev 3 C 9 Sheet 2 of 2 ...
Страница 66: ...C 10 KI OM 0591 Rev 3 Schematic Water Heater Electric WHE 3 Upgrade With PV S 3 2 Cert Sheet 1 of 2 ...
Страница 67: ...KI OM 0591 Rev 3 C 11 Sheet 2 of 2 ...
Страница 68: ...C 12 KI OM 0591 Rev 3 Intentionally blank ...