![JETStream TwinForce Series Скачать руководство пользователя страница 67](http://html1.mh-extra.com/html/jetstream/twinforce-series/twinforce-series_operation-manual_3879678067.webp)
59
TwinForce™ Series Waterblast Unit
Figure 96: Gland Installation.
Plunger Coupling
Plunger
Figure 97: Plunger Coupling Installation.
Figure 98: Tightening the Gland.
5. Pull the plunger (Figure 96) back to meet
the crosshead pony rod. If the packing is
too tight to move the plunger by hand,
the pump can be rotated by hand (via the
belts) to move the pony rod to meet the
plunger.
6. Place the plunger coupling into position
and install the coupling bolts (Figure 97).
Tighten the bolts to 20 ft.-lb.(27 N·m).
7. Use the pump wrench and a 5 lb. (2 kg)
hammer to tighten the gland nuts to ap-
proximately 250 ft.-lb.(338 N·m). Hit the
wrench about three times using moderate
force (Figure 98
-
cient torque on the nut.
8. Repeat the previous steps for the remain-
ing stuffing boxes.
9. Connect the water lubrication lines and
close the rod box cover.
10. It is necessary to break-in new packing
properly to ensure optimal performance
and a proper seal. Refer to
for the proper
break-in procedure.
Содержание TwinForce Series
Страница 1: ...OPERATION MANUAL TwinForce Series Waterblast Unit...
Страница 2: ...Visual Safety System...
Страница 11: ...3 TwinForce Series Waterblast Unit...
Страница 22: ...14 Operation Manual...
Страница 42: ...34 Operation Manual...
Страница 48: ...40 Operation Manual...
Страница 52: ...44 Operation Manual...
Страница 100: ...92 Operation Manual...
Страница 104: ...96 Operation Manual...
Страница 106: ...A 2 Appendix A Technical Specifications...
Страница 107: ...B 1 TwinForce Series Waterblast Unit APPENDIX B LONG TERM STORAGE PROCEDURE...
Страница 108: ...B 2 Appendix B Long Term Storage Procedure...