10
Read and understand the
entire contents of this manual before attempting
set-up or operation. Failure to comply may
cause serious injury.
6.0
Set-up and assembly
Open shipping container and check for shipping
damage. Report any damage immediately to your
distributor and shipping agent. Do not discard any
shipping material until the Turret Mill is assembled
and running properly.
Compare the contents of your container with the
following parts list to make sure all parts are intact.
Missing parts, if any, should be reported to your
distributor. Read the instruction manual thoroughly
for assembly, maintenance and safety instructions.
If your mill is supplied with an optional Table
Powerfeed and/or DRO, be sure to consult the
separate instruction materials that accompany
them.
6.1
Contents of shipping container
Note: Some parts may be pre-installed on the mill.
Figure 1: contents
1 Turret Mill (not shown)
1 Chip tray (not shown)
1 Flat Way Cover
1 Pleated Way Cover
1 Draw Bar
3 Table Adjustment Handles
1 Tool Box, containing:
4 Leveling pads
1 Hex Key Set (1.5-10mm) *
1 17/19mm Box Wrench *
1 Cross Point Screw Driver #2 *
1 Flat Blade Screw Driver #2 *
1 Oil Can *
1 Elevating Crank Handle
1 Handwheel
1 Coarse Feed Handle
1 Lifting ring
1 Electric box key
1 Operator’s Manual
1 Product Registration Card
* parts with asterisk are also included in tool box
service kit JTM949EVS-TB or JTM1050EVS2-TB.
6.2
Preparing the mill for service
1. Remove any crating which may be covering the
machine on the pallet.
2. Remove accessory items from the pallet or
machine table. Compare items with
section 6.1
.
3. Install provided lifting ring into tapped hole atop
ram. (
Note
: If your mill came with a top-
mounted DRO, remove DRO from hole to install
lifting ring. Reinstall DRO after machine has
been positioned.) Check lifting ring to
be
certain it is tight.
4. Check the tightness of the lock handles on the
ram (see Figure 21) to be
certain the ram is
locked tight.
5. Remove the nuts and/or bolts, which secure the
machine to the pallet.
6. Center an overhead crane or other suitable
overhead lifting device and sling arrangement
over the lifting ring.
Note:
This machine weighs over 2200 pounds
– Be certain lifting arrangement is new or in
excellent condition and has a safety factor that
will account for age, difficulties in lifting, etc.
When lifting using the ring, the machine will tip
forward. If you wish, you can minimize this
tipping by rigging a support sling over front of
machine. Be careful when doing this, to prevent
sling from damaging any components on front
of machine. Be sure to steady mill to prevent it
from spinning.
7. Lift machine off pallet no higher than necessary
to clear the hold-down hardware, then pull the
pallet out of the way. Do NOT get hands or feet
underneath machine when removing pallet!
8. Put machine base over the hold-down system
where the machine will be spotted. Anchor bolts
of sufficient size and length must be fastened to
the floor according to footprint of mill. See
Figure 1.
Note:
The accompanying diagrams show you
the maximum dimensions of the machines with
the table, ram, etc., fully extended in all possible
directions.
Содержание JTM-949EVS4
Страница 13: ...13 9 3 Control positions for milling and drilling operations Table 3...
Страница 23: ...23 13 1 1 JTM 949EVS JTM 1050EVS Upper Head Assembly Exploded View...
Страница 26: ...26 13 2 1 JTM 949EVS JTM 1050EVS Lower Head Assembly Exploded View...
Страница 30: ...30 13 3 1 JTM 949EVS Base Machine Exploded View...
Страница 33: ...33 13 4 1 JTM 1050EVS Base Machine Exploded View...
Страница 36: ...36 13 5 1 JTM 949EVS Table Assembly Exploded View...
Страница 38: ...38 13 6 1 JTM 1050EVS Table Assembly Exploded View...
Страница 46: ...46 14 0 Electrical Connections 14 1 JTM 949EVS 230 and JTM 1050EVS2 230V ONLY...
Страница 47: ...47 14 1 JTM 949EVS4 and JTM 1050EVS4 460V ONLY...
Страница 48: ...48 427 New Sanford Road LaVergne Tennessee 37086 Phone 800 274 6848 www jettools com...