Jet 120i Скачать руководство пользователя страница 3

3

WARNING: Do not switch on if there is a 
possibility that the water in the heater is frozen.

Siting The Unit

The cylinder must be vertically floor mounted. 
Although location is not critical, the following points 
should be considered:

• 

The cylinder should be sited to ensure minimum 
dead leg distances, particularly to the point of 
most frequent use.

• 

Avoid siting where extreme cold temperatures will 
be experienced. All exposed pipe work should 
be insulated.

• 

The discharge pipework from the safety valves 
must have minimum fall of 1:200 from the unit and 
terminate in a safe and visible position.

• 

Access to associated controls and immersion 
heaters must be available for the servicing and 
maintenance of the system. Where these controls 
are installed against a wall a minimum distance of 
250mm must be left (see Fig. 01, below).

• 

Each circuit must be protected by a suitable  
double pole isolating switch with a contact 
separation of at least 3mm in both poles.

• 

Ensure that the floor area for the cylinder is level 
and capable of permanently supporting the 
weight when full of water. (see Table 02, Page 7)

General Requirements

WALL

Min 250mm

Min 250mm

Fig. 01: Siting the Unit

IMPORTANT: This appliance can be 

used by children aged from 8 years and 

above and persons with reduced physical 

sensory or mental capabilities or lack of 

experience and knowledge if they have 

been given supervisory or instruction 

concerning use of the appliance in a 

safe way and understand the hazards 

involved.  

Children shall not play with the appliance.  

Cleaning and user maintenance shall not 

be made by children without supervision.

Also: 

- water may drip from the discharge pipe 

of the pressure-relief device and this pipe 

must be left open to the atmosphere; (see 

page 10 for details)

- the pressure-relief device is to be 

operated regularly to remove lime deposits 

and to verify that it is not blocked; (see 

page 10 for details)

- how hot water can be drained. (see page 

15 for more details)

- the type or characteristics of the 

pressure-relief device and how to connect 

it; (see Figure 02 for details and Figure 05 

for the installation schematic)

- a discharge pipe connected to the 

pressure-relief device is to be installed in 

a continuously  downward direction and 

in frost free environment; (see Figure 04 

for details)

- details on how to set the temperature 

controls for both immersion heaters and 

boiler controls can be found in section 

“Commissioning Instructions (see page 

14 for details).

- each circuit must be protected by a 

suitable double pole isolating switch with 

a contact separation of at least 3mm in 

both poles (see page 12 for details).

- recommended minimum water pressure 

0.15MPa (1.5 bar). Max water pressure 

1.6MPa (16 bar), see page 4 for details.

Содержание 120i

Страница 1: ...alve assembly Tundish 2 Port motorised valve Compression nuts olives Immersion heater spanner Installation servicing instructions Guarantee card IMPORTANT Please read understand all these instructions...

Страница 2: ...stallation which must be carried out by a competent plumbing and electrical installer in accordance with Building Regulation G3 The Building Standards Scotland Regulations 1990 or The Building Regulat...

Страница 3: ...ns with reduced physical sensory or mental capabilities or lack of experience and knowledge if they have been given supervisory or instruction concerning use of the appliance in a safe way and underst...

Страница 4: ...ll be supplying both the hot and cold water requirements simultaneously It is recommended that the maximum water demand is assessed and the water supply checked to ensure this demand can be satisfacto...

Страница 5: ...old water port available Drain Tap A suitable drain tap should be installed in the cold water supply to the cylinder between the expansion valve see Fig 05 page 11 and the heater at a lower level as p...

Страница 6: ...mensions Model Reference Dimensions mm A B 120 Ind 931 616 150 Ind 1114 800 170 Ind 1241 927 210 Ind 1499 1184 250 Ind 1752 1379 300 Ind 2065 1694 315 A 354 B Hot Outlet T P Valve Cold Inlet Primary R...

Страница 7: ...30 2 34 8 37 7 46 7 57 9 45 min 25 0 28 8 32 3 34 2 41 7 51 0 Coil rating kW 15l min 13 1 16 2 13 7 14 3 14 8 13 0 30l min 16 3 16 3 17 1 17 3 17 4 15 9 45l min 17 6 17 7 18 8 19 1 19 0 17 5 Pressure...

Страница 8: ...undish 3 54 The tundish should be vertical located in the same space as the unvented hot water storage system and be fitted as close as possible to and lower than the valve with no more than 600mm of...

Страница 9: ...to prevent contact whilst maintaining visibility and c discharges at high level e g into a metal hopper and metal downpipe with the end of the discharge pipe clearly visible or onto a roof capable of...

Страница 10: ...outlet sizes NOTE The table below is based on copper tube Plastic pipes may be of different bore and resistance Sizes and maximum lengths of plastic should be calculated using data prepared for the ty...

Страница 11: ...ry Circulation Connection To hot outlets Primary flow Primary return T P relief valve Balanced cold water connection if required Cold water combination valve Mains water supply Isolating valve not sup...

Страница 12: ...raw off points Discharge pipework from valve outlets to tundish Connection to the primary circuit All connections are 22mm compression However 3 4 BSP parallel threaded fittings can be fitted to the p...

Страница 13: ...8 9 10 1 2 3 4 5 6 7 8 9 10 Supply 1 2 3 G 1 Br Bl 2 0 GY 3 G 1 Br Bl 2 0 1 3 2 2 L N Programmer Boiler Pump Zone valve HTG Cylinder terminal block Room stat Zone valve DHW supplied Junction box 3 2 3...

Страница 14: ...n the lever to the AUTOMATIC position Switch on the boiler ensure the programmer is set to Domestic Hot Water and allow the cylinder to heat up to a normal working temperature 60o C recommended If nec...

Страница 15: ...f necessary the temperature can be adjusted by inserting a flat bladed screwdriver in the adjustment knob on front of the immersion heater thermostat and rotating The adjustment represents a temperatu...

Страница 16: ...es with the 2 port motorised zone valve supplied to interrupt the flow of primary water around the heat exchanger coil when the control temperature has been reached The controls are located within the...

Страница 17: ...3 Check and refit as required Water from hot taps is cold 1 Back up immersion heater not switched on 1 Check and switch on 2 Back up immersion heater thermal cut out has tripped 2 Check Reset by pushi...

Страница 18: ...dish not shown 95 605 838 6 Cold water combination valve complete 70 365 20 7 Nut olive pack 4 of each 95 607 838 8 Terminal cover 95 614 305 9 Blanking plate assembly 95 605 881 10 Direct combined th...

Страница 19: ...off your waste equipment for recycling please contact your local city office your household waste disposal service or the company where this product was purchased Insulation is by means of an approved...

Страница 20: ...set temperature C I min Yes Type of control system if applicable Y Plan S Plan Other Is the cylinder solar or other renewable compatible Yes No What is the hot water temperature at the nearest outlet...

Страница 21: ...Telephone No Comments Signature SERVICE 07 Date Engineer name Company name Telephone No Comments Signature SERVICE 09 Date Engineer name Company name Telephone No Comments Signature SERVICE 02 Date E...

Страница 22: ...22 Notes...

Страница 23: ...23 Notes...

Страница 24: ...d that It has been correctly installed as per the instructions contained in the instruction manual and all relevant Codes of Practice and Regulations in force at the time of installation The Benchmark...

Отзывы: