Warnings

I F   W AT E R   D I S C H A R G E S   F R O M   T H E 
TEMPERATURE/PRESSURE RELIEF VALVE ON 
CYLINDER SHUT DOWN THE BOILER. DO NOT 
TURN OFF ANY WATER SUPPLY. CONTACT 
A COMPETENT INSTALLER FOR UNVENTED 
WATER HEATERS TO CHECK THE SYSTEM.

DO NOT TAMPER WITH ANY OF THE SAFETY 
VALVES FITTED TO THE SYSTEM. IF A FAULT IS 
SUSPECTED CONTACT A COMPETENT INSTALLER.

Benchmark 

The cylinder is covered by the Benchmark Scheme 
which aims to improve the standards of installation 
and commissioning of domestic heating and 
hot water systems in the UK and to encourage 
regular servicing to optimise safety, efficiency and 
performance.

Benchmark is managed and promoted by the 
Heating and Hotwater Industry Council. For more 
information visit www.centralheating.co.uk.

Please ensure that the installer has fully completed 
the Benchmark Checklist (pages 20 & 21) of this 
manual and that you have signed it to say that 
you have received a full and clear explanation of its 
operation. The installer is legally required to complete 
a commissioning checklist as a means of complying 
with the appropriate Building Regulations (England 
& Wales).

All installations must be notified to Local Area
Building Control either directly or through a
Competent Persons Scheme. A Building Regulations 
Compliance Certificate will then be issued to the
customer who should, on receipt, write the
Notification Number on the Benchmark Checklist.

This product should be serviced regularly to optimise 
its safety, efficiency and performance. The service 
engineer should complete the relevant Service 
Record on the Benchmark Checklist after each 
service.

The Benchmark Checklist may be required in the 
event of any warranty work.  

Flow Performance

When initially opening hot outlets a small surge in 
flow may be noticed as pressures stabilise. This is 
quite normal with unvented systems. In some areas 
cloudiness may be noticed in the hot water. This is 
due to aeration of the water, is quite normal and will 
quickly clear.

Temperature Controls - Indirect Units

The cylinder units are fitted with an indirect thermostat 
and thermal cut-out. These controls must be wired in 
series with the 2 port motorised zone valve supplied 
to interrupt the flow of primary water around the 
heat exchanger coil when the control temperature 
has been reached. The controls are located within 
the lower terminal housing along with the immersion 
heater thermostat. The thermostat is factory set to 
give a water storage temperature of approx. 55°C 
to 60°C. Access to the thermostat can be made by 
opening the terminal housing cover - DISCONNECT 
THE ELECTRICAL SUPPLY BEFORE OPENING 
THE COVER. Temperature adjustment is made by 
inserting a flat bladed screwdriver in the adjustment 
knob and rotating. The minimum thermostat setting 
is 12°C. The adjustment represents a temperature 
range of 12°C to 72°C (Fig. 07, page 11). If in any 
doubt contact a competent electrician. 

An immersion heater is also provided for use should 
the indirect heat source be shut down for any purpose. 
The immersion heater control temperature is set 
using the immersion heater thermostat.

DO NOT bypass the thermal cut-out(s) in any 
circumstances.

Operational Faults

Operational faults and their possible causes are 
detailed in the Fault Finding section of this book. It 
is recommended that faults should be checked by 
a competent installer.

The air volume within the cylinder will periodically 
require recharging to ensure any expanded water is 
accommodated within the unit. A discharge of water 
INTERMITTENTLY from the 

pressure relief valve

 will 

indicate the air volume has reduced to a point where 
it can no longer accommodate the expansion. To 
recharge the air volume:-
i) Turn off the heat source to the cylinder via 

programmers / immersion isolation switch(es).

ii) Turn off the water supply to the cylinder by turning 
off the isolating valve at the cylinder, if fitted or the 

main incoming supply to the house.

iii) Open the lowest hot tap supplied by the cylinder.

iv) Hold open the temperature and pressure relief
 valve until water ceases to run from the tap and 

gurgling noise at the valve stops.

v) Close the temperature and pressure relief valve.

vi) Turn on the water supply to the cylinder

vii) The air volume will be automatically recharged 
as the unit refills. If after following the above actions 
water still discharges from the pressure relief valve, 
further advice should be sought from a competent 
installer or Technical Support

User Instructions

Содержание 120i

Страница 1: ...alve assembly Tundish 2 Port motorised valve Compression nuts olives Immersion heater spanner Installation servicing instructions Guarantee card IMPORTANT Please read understand all these instructions...

Страница 2: ...stallation which must be carried out by a competent plumbing and electrical installer in accordance with Building Regulation G3 The Building Standards Scotland Regulations 1990 or The Building Regulat...

Страница 3: ...ns with reduced physical sensory or mental capabilities or lack of experience and knowledge if they have been given supervisory or instruction concerning use of the appliance in a safe way and underst...

Страница 4: ...ll be supplying both the hot and cold water requirements simultaneously It is recommended that the maximum water demand is assessed and the water supply checked to ensure this demand can be satisfacto...

Страница 5: ...old water port available Drain Tap A suitable drain tap should be installed in the cold water supply to the cylinder between the expansion valve see Fig 05 page 11 and the heater at a lower level as p...

Страница 6: ...mensions Model Reference Dimensions mm A B 120 Ind 931 616 150 Ind 1114 800 170 Ind 1241 927 210 Ind 1499 1184 250 Ind 1752 1379 300 Ind 2065 1694 315 A 354 B Hot Outlet T P Valve Cold Inlet Primary R...

Страница 7: ...30 2 34 8 37 7 46 7 57 9 45 min 25 0 28 8 32 3 34 2 41 7 51 0 Coil rating kW 15l min 13 1 16 2 13 7 14 3 14 8 13 0 30l min 16 3 16 3 17 1 17 3 17 4 15 9 45l min 17 6 17 7 18 8 19 1 19 0 17 5 Pressure...

Страница 8: ...undish 3 54 The tundish should be vertical located in the same space as the unvented hot water storage system and be fitted as close as possible to and lower than the valve with no more than 600mm of...

Страница 9: ...to prevent contact whilst maintaining visibility and c discharges at high level e g into a metal hopper and metal downpipe with the end of the discharge pipe clearly visible or onto a roof capable of...

Страница 10: ...outlet sizes NOTE The table below is based on copper tube Plastic pipes may be of different bore and resistance Sizes and maximum lengths of plastic should be calculated using data prepared for the ty...

Страница 11: ...ry Circulation Connection To hot outlets Primary flow Primary return T P relief valve Balanced cold water connection if required Cold water combination valve Mains water supply Isolating valve not sup...

Страница 12: ...raw off points Discharge pipework from valve outlets to tundish Connection to the primary circuit All connections are 22mm compression However 3 4 BSP parallel threaded fittings can be fitted to the p...

Страница 13: ...8 9 10 1 2 3 4 5 6 7 8 9 10 Supply 1 2 3 G 1 Br Bl 2 0 GY 3 G 1 Br Bl 2 0 1 3 2 2 L N Programmer Boiler Pump Zone valve HTG Cylinder terminal block Room stat Zone valve DHW supplied Junction box 3 2 3...

Страница 14: ...n the lever to the AUTOMATIC position Switch on the boiler ensure the programmer is set to Domestic Hot Water and allow the cylinder to heat up to a normal working temperature 60o C recommended If nec...

Страница 15: ...f necessary the temperature can be adjusted by inserting a flat bladed screwdriver in the adjustment knob on front of the immersion heater thermostat and rotating The adjustment represents a temperatu...

Страница 16: ...es with the 2 port motorised zone valve supplied to interrupt the flow of primary water around the heat exchanger coil when the control temperature has been reached The controls are located within the...

Страница 17: ...3 Check and refit as required Water from hot taps is cold 1 Back up immersion heater not switched on 1 Check and switch on 2 Back up immersion heater thermal cut out has tripped 2 Check Reset by pushi...

Страница 18: ...dish not shown 95 605 838 6 Cold water combination valve complete 70 365 20 7 Nut olive pack 4 of each 95 607 838 8 Terminal cover 95 614 305 9 Blanking plate assembly 95 605 881 10 Direct combined th...

Страница 19: ...off your waste equipment for recycling please contact your local city office your household waste disposal service or the company where this product was purchased Insulation is by means of an approved...

Страница 20: ...set temperature C I min Yes Type of control system if applicable Y Plan S Plan Other Is the cylinder solar or other renewable compatible Yes No What is the hot water temperature at the nearest outlet...

Страница 21: ...Telephone No Comments Signature SERVICE 07 Date Engineer name Company name Telephone No Comments Signature SERVICE 09 Date Engineer name Company name Telephone No Comments Signature SERVICE 02 Date E...

Страница 22: ...22 Notes...

Страница 23: ...23 Notes...

Страница 24: ...d that It has been correctly installed as per the instructions contained in the instruction manual and all relevant Codes of Practice and Regulations in force at the time of installation The Benchmark...

Отзывы: