Jet 120i Скачать руководство пользователя страница 2

2

Introduction ........................................................... 2

General Requirements .......................................... 3

Installation General ............................................... 5

Installation Discharge ............................................ 7

Installation Indirect ............................................... 11

Commissioning ..................................................... 13

Maintenance ......................................................... 14

User Instructions .................................................. 15

Fault Finding & Servicing ..................................... 16

Spares ................................................................... 17

Heat Loss .............................................................. 18

Environmental Information ................................... 18

Commissioning Check List .................................. 20

Service Record ..................................................... 21

Guarantee ............................................................. 24

Technical Support ................................................. 24

Contents

The cylinder is a purpose designed unvented water 
heater. The unit has a stainless steel inner vessel, 
which ensures an excellent standard of corrosion 
resistance. The outer casing is a combination of 
resilient thermoplastic mouldings and plastic coated 
corrosion proofed steel sheet. All products are 
insulated with CFC free polyurethane foam to give 
good heat loss performance. (see Table 06, page 19)

The unit is supplied complete with all the necessary 
safety and control devices needed to allow 
connection to the cold water mains. All these 
components are preset and not adjustable.

This appliance complies with the requirements of the 
CE marking directive and is Kiwa approved to show 
compliance with Building Regulations (Section G3).

The following instructions are offered as a guide to 
installation which must be carried out by a competent 
plumbing and electrical installer in accordance with 
Building Regulation G3, The Building Standards 
(Scotland) Regulations 1990, or The Building 
Regulations (Northern Ireland). 

NOTE: Prior to installation the unit should be stored 
in an upright position in an area free from excessive 
damp or humidity.

The Benchmark Scheme

Benchmark places responsibilities on both 
manufacturers and installers. The purpose is to 
ensure that customers are provided with the correct 
equipment for their needs, that it is installed, 
commissioned and serviced in accordance with the 
manufacturer’s instructions by competent persons 
and that it meets the requirements of the appropriate 
Building Regulations. The Benchmark Checklist can 
be used to demonstrate compliance with Building 
Regulations and should be provided to the customer 
for future reference.

Installers are required to carry out installation, 
commissioning and servicing work in accordance 
with the Benchmark Code of Practice which is 
available from the Heating and Hot water Industry 
Council who manage and promote the scheme. Visit 
www.centralheating.co.uk for more information.

IMPORTANT NOTE TO USER: PLEASE REFER TO 
THE USER INSTRUCTIONS SECTION ON PAGE 16 
FOR IMPORTANT INFORMATION WITH RESPECT TO 
THE BENCHMARK SCHEME

Introduction

Содержание 120i

Страница 1: ...alve assembly Tundish 2 Port motorised valve Compression nuts olives Immersion heater spanner Installation servicing instructions Guarantee card IMPORTANT Please read understand all these instructions...

Страница 2: ...stallation which must be carried out by a competent plumbing and electrical installer in accordance with Building Regulation G3 The Building Standards Scotland Regulations 1990 or The Building Regulat...

Страница 3: ...ns with reduced physical sensory or mental capabilities or lack of experience and knowledge if they have been given supervisory or instruction concerning use of the appliance in a safe way and underst...

Страница 4: ...ll be supplying both the hot and cold water requirements simultaneously It is recommended that the maximum water demand is assessed and the water supply checked to ensure this demand can be satisfacto...

Страница 5: ...old water port available Drain Tap A suitable drain tap should be installed in the cold water supply to the cylinder between the expansion valve see Fig 05 page 11 and the heater at a lower level as p...

Страница 6: ...mensions Model Reference Dimensions mm A B 120 Ind 931 616 150 Ind 1114 800 170 Ind 1241 927 210 Ind 1499 1184 250 Ind 1752 1379 300 Ind 2065 1694 315 A 354 B Hot Outlet T P Valve Cold Inlet Primary R...

Страница 7: ...30 2 34 8 37 7 46 7 57 9 45 min 25 0 28 8 32 3 34 2 41 7 51 0 Coil rating kW 15l min 13 1 16 2 13 7 14 3 14 8 13 0 30l min 16 3 16 3 17 1 17 3 17 4 15 9 45l min 17 6 17 7 18 8 19 1 19 0 17 5 Pressure...

Страница 8: ...undish 3 54 The tundish should be vertical located in the same space as the unvented hot water storage system and be fitted as close as possible to and lower than the valve with no more than 600mm of...

Страница 9: ...to prevent contact whilst maintaining visibility and c discharges at high level e g into a metal hopper and metal downpipe with the end of the discharge pipe clearly visible or onto a roof capable of...

Страница 10: ...outlet sizes NOTE The table below is based on copper tube Plastic pipes may be of different bore and resistance Sizes and maximum lengths of plastic should be calculated using data prepared for the ty...

Страница 11: ...ry Circulation Connection To hot outlets Primary flow Primary return T P relief valve Balanced cold water connection if required Cold water combination valve Mains water supply Isolating valve not sup...

Страница 12: ...raw off points Discharge pipework from valve outlets to tundish Connection to the primary circuit All connections are 22mm compression However 3 4 BSP parallel threaded fittings can be fitted to the p...

Страница 13: ...8 9 10 1 2 3 4 5 6 7 8 9 10 Supply 1 2 3 G 1 Br Bl 2 0 GY 3 G 1 Br Bl 2 0 1 3 2 2 L N Programmer Boiler Pump Zone valve HTG Cylinder terminal block Room stat Zone valve DHW supplied Junction box 3 2 3...

Страница 14: ...n the lever to the AUTOMATIC position Switch on the boiler ensure the programmer is set to Domestic Hot Water and allow the cylinder to heat up to a normal working temperature 60o C recommended If nec...

Страница 15: ...f necessary the temperature can be adjusted by inserting a flat bladed screwdriver in the adjustment knob on front of the immersion heater thermostat and rotating The adjustment represents a temperatu...

Страница 16: ...es with the 2 port motorised zone valve supplied to interrupt the flow of primary water around the heat exchanger coil when the control temperature has been reached The controls are located within the...

Страница 17: ...3 Check and refit as required Water from hot taps is cold 1 Back up immersion heater not switched on 1 Check and switch on 2 Back up immersion heater thermal cut out has tripped 2 Check Reset by pushi...

Страница 18: ...dish not shown 95 605 838 6 Cold water combination valve complete 70 365 20 7 Nut olive pack 4 of each 95 607 838 8 Terminal cover 95 614 305 9 Blanking plate assembly 95 605 881 10 Direct combined th...

Страница 19: ...off your waste equipment for recycling please contact your local city office your household waste disposal service or the company where this product was purchased Insulation is by means of an approved...

Страница 20: ...set temperature C I min Yes Type of control system if applicable Y Plan S Plan Other Is the cylinder solar or other renewable compatible Yes No What is the hot water temperature at the nearest outlet...

Страница 21: ...Telephone No Comments Signature SERVICE 07 Date Engineer name Company name Telephone No Comments Signature SERVICE 09 Date Engineer name Company name Telephone No Comments Signature SERVICE 02 Date E...

Страница 22: ...22 Notes...

Страница 23: ...23 Notes...

Страница 24: ...d that It has been correctly installed as per the instructions contained in the instruction manual and all relevant Codes of Practice and Regulations in force at the time of installation The Benchmark...

Отзывы: