Jet 120i Скачать руководство пользователя страница 15

15

Maintenance Requirements

Unvented hot water systems have a continuing 
maintenance requirement in order to ensure safe 
working and optimum performance. It is essential 
that the relief valve(s) are periodically inspected 
and manually opened to ensure no blockage has 
occurred in the valves or discharge pipework.

Similarly cleaning of the strainer element and 
replacement of the air in the internal  air bubble will 
help to prevent possible operational faults.

The maintenance checks described below should be 
performed by a competent person on a regular basis, 
e.g. annually to coincide with boiler maintenance.

After any maintenance, please complete the relevant 
Service Interval Record section of the Benchmark 
Checklist on page 20 of this document.

Inspection

The immersion heater boss can be used as an 
access for inspecting the cylinder internally.

Safety Valve Operation

Manually operate the temperature/pressure relief 
valve for a few seconds. Check water is discharged 
and that it flows freely through the tundish and 
discharge pipework. Check valve reseats correctly 
when released. 

NOTE: Water discharged may be very hot!

Repeat the above procedure for the expansion relief 
valve.

Strainer

Turn off the cold water supply, boiler and immersion 
heaters. The lowest hot water tap should then be 
opened to de-pressurise the system. Remove the 
pressure reducing cartridge to access the strainer 
mesh. Wash any particulate matter from the strainer 
under clean water. Re-assemble ensuring the seal 
is correctly fitted. DO NOT use any other type of 
sealant.

Descaling Immersion Heater

Before removing the immersion heater the unit 
must be drained. 

Before draining ensure the water, 

electrical supply and boiler are OFF.

 Attach a hose-

pipe to the drain cock having sufficient length to take 
water to a suitable discharge point below the level of 
the unit. Open a hot tap close to the unit and open 
drain valve to drain the cylinder. 

Remove the cover 

to the immersion heater housing and disconnect 
wiring from immersion heater. Carefully remove the 
thermostat capillaries. Note the  order of the capillaries 
within the pocket. Remove the terminal shroud. 

If necessary the temperature can be adjusted by 
inserting a flat bladed screwdriver in the adjustment 
knob on front of the immersion heater thermostat and 
rotating. The adjustment represents a temperature 
range of 12°C to 72°C. Check the operation of 
thermostat(s) and that no water has issued from the 
expansion relief valve or temperature/pressure relief 
valve during the heating cycle. 

Indirect Units

Switch OFF electrical supply to the immersion 
heater before removing the cover. 

Open the cover 

to the immersion heater housing and disconnect 
wiring from immersion heater. Carefully remove the 
thermostat capillaries. Remove the terminal shroud. 
Unscrew immersion heater backnut and remove 
immersion heater from the unit.  A key spanner is 
supplied with the cylinder unit for easy removal/
tightening of the immersion heater. Over time the 
immersion heater gasket may become stuck to the 
mating surface. To break the seal insert a round 
bladed screwdriver into one of the pockets on the 
immersion heater and gently lever up and down.

 

Carefully remove any scale from the surface of the 
element. DO NOT use a sharp implement as damage 
to the element surface could be caused. Ensure 
sealing surfaces are clean and seals are undamaged, 
if in doubt fit a new gasket (part number 70 351 68).
 

Replace immersion heater ensuring the (right angled) 
element hangs vertically downwards towards the 
base of the unit. It may be helpful to support the 
immersion heater using a round bladed screwdriver 
inserted into one of the thermostat pockets whilst 
the backnut is tightened. Replace the terminal 
shroud. Replace thermostat capillaries into pockets. 
Connect  wiring to element. Check, and close and 
secure immersion heater housing cover.  

Re-Commissioning 

Check all electrical and plumbing connections are 
secure. Close the drain cock. 

DO NOT switch on the 

immersion heater or boiler while the unit is empty. 

With a hot tap open, turn on the cold water supply 
and allow unit to refill. When water flows from the 
hot tap allow to flow for a short while to purge air 
and flush through any disturbed particles. Close hot 
tap and then open successive hot taps in system to 
purge any air. When completely full and purged check 
system for leaks. Replace and secure immersion 
heater housing cover. The heating source (immersion 
heater or boiler) can then be switched on.

Maintenance

Содержание 120i

Страница 1: ...alve assembly Tundish 2 Port motorised valve Compression nuts olives Immersion heater spanner Installation servicing instructions Guarantee card IMPORTANT Please read understand all these instructions...

Страница 2: ...stallation which must be carried out by a competent plumbing and electrical installer in accordance with Building Regulation G3 The Building Standards Scotland Regulations 1990 or The Building Regulat...

Страница 3: ...ns with reduced physical sensory or mental capabilities or lack of experience and knowledge if they have been given supervisory or instruction concerning use of the appliance in a safe way and underst...

Страница 4: ...ll be supplying both the hot and cold water requirements simultaneously It is recommended that the maximum water demand is assessed and the water supply checked to ensure this demand can be satisfacto...

Страница 5: ...old water port available Drain Tap A suitable drain tap should be installed in the cold water supply to the cylinder between the expansion valve see Fig 05 page 11 and the heater at a lower level as p...

Страница 6: ...mensions Model Reference Dimensions mm A B 120 Ind 931 616 150 Ind 1114 800 170 Ind 1241 927 210 Ind 1499 1184 250 Ind 1752 1379 300 Ind 2065 1694 315 A 354 B Hot Outlet T P Valve Cold Inlet Primary R...

Страница 7: ...30 2 34 8 37 7 46 7 57 9 45 min 25 0 28 8 32 3 34 2 41 7 51 0 Coil rating kW 15l min 13 1 16 2 13 7 14 3 14 8 13 0 30l min 16 3 16 3 17 1 17 3 17 4 15 9 45l min 17 6 17 7 18 8 19 1 19 0 17 5 Pressure...

Страница 8: ...undish 3 54 The tundish should be vertical located in the same space as the unvented hot water storage system and be fitted as close as possible to and lower than the valve with no more than 600mm of...

Страница 9: ...to prevent contact whilst maintaining visibility and c discharges at high level e g into a metal hopper and metal downpipe with the end of the discharge pipe clearly visible or onto a roof capable of...

Страница 10: ...outlet sizes NOTE The table below is based on copper tube Plastic pipes may be of different bore and resistance Sizes and maximum lengths of plastic should be calculated using data prepared for the ty...

Страница 11: ...ry Circulation Connection To hot outlets Primary flow Primary return T P relief valve Balanced cold water connection if required Cold water combination valve Mains water supply Isolating valve not sup...

Страница 12: ...raw off points Discharge pipework from valve outlets to tundish Connection to the primary circuit All connections are 22mm compression However 3 4 BSP parallel threaded fittings can be fitted to the p...

Страница 13: ...8 9 10 1 2 3 4 5 6 7 8 9 10 Supply 1 2 3 G 1 Br Bl 2 0 GY 3 G 1 Br Bl 2 0 1 3 2 2 L N Programmer Boiler Pump Zone valve HTG Cylinder terminal block Room stat Zone valve DHW supplied Junction box 3 2 3...

Страница 14: ...n the lever to the AUTOMATIC position Switch on the boiler ensure the programmer is set to Domestic Hot Water and allow the cylinder to heat up to a normal working temperature 60o C recommended If nec...

Страница 15: ...f necessary the temperature can be adjusted by inserting a flat bladed screwdriver in the adjustment knob on front of the immersion heater thermostat and rotating The adjustment represents a temperatu...

Страница 16: ...es with the 2 port motorised zone valve supplied to interrupt the flow of primary water around the heat exchanger coil when the control temperature has been reached The controls are located within the...

Страница 17: ...3 Check and refit as required Water from hot taps is cold 1 Back up immersion heater not switched on 1 Check and switch on 2 Back up immersion heater thermal cut out has tripped 2 Check Reset by pushi...

Страница 18: ...dish not shown 95 605 838 6 Cold water combination valve complete 70 365 20 7 Nut olive pack 4 of each 95 607 838 8 Terminal cover 95 614 305 9 Blanking plate assembly 95 605 881 10 Direct combined th...

Страница 19: ...off your waste equipment for recycling please contact your local city office your household waste disposal service or the company where this product was purchased Insulation is by means of an approved...

Страница 20: ...set temperature C I min Yes Type of control system if applicable Y Plan S Plan Other Is the cylinder solar or other renewable compatible Yes No What is the hot water temperature at the nearest outlet...

Страница 21: ...Telephone No Comments Signature SERVICE 07 Date Engineer name Company name Telephone No Comments Signature SERVICE 09 Date Engineer name Company name Telephone No Comments Signature SERVICE 02 Date E...

Страница 22: ...22 Notes...

Страница 23: ...23 Notes...

Страница 24: ...d that It has been correctly installed as per the instructions contained in the instruction manual and all relevant Codes of Practice and Regulations in force at the time of installation The Benchmark...

Отзывы: