 |  Operation Manual C 2213  |  Safety

1.4  Hazards due to non-compliance with the safety instructions 

Failure to comply with the safety instructions may endanger not only people, but also the environment and the 
product/system. Non-compliance with the safety instructions can lead to the loss of all entitlement to damages. 
The following hazards in particular may arise: 

•  Failure of major system functions. 
•  Failure of specified methods for maintenance and repair. 
•  Danger to people due to electrical, mechanical and chemical effects.
•  Danger to the environment due to leakage of hazardous substances.

1.5  Safe operation

The safety instructions contained in this Operation & Maintenance Manual must be observed. The owner is 
responsible for ensuring compliance with local safety regulations. 

1.6  Safety instructions for the owner/operator

Leakages must immediately be eliminated by specialist staff in order to avoid potential hazards for persons and 
environment. Statutory regulations must be observed.
Danger due to electric power must be excluded (for further details, refer to the VDE regulations and the regula-
tions of the local public utilities).

1.7  Safety instructions for installation, maintenance and inspection

The owner must ensure that all maintenance, inspection and installation work is undertaken by authorized and 
duly qualified skilled personnel who have also studied the Operation & Maintenance Manual in depth. 
Before carrying out installation and maintenance works, always make sure that the unit is not connected to the 
system. The procedure specified in the Operation & Maintenance Manual for shutting down the system must be 
observed without fail. 
The device or the system and all material-conveying parts must be vented. All safety mechanisms and guards 
must be refitted and reactivated as soon as the work is complete. 
The points set out in the section Installation and commissioning must be observed before starting the pump/
system. 

1.8  Unauthorized modification and production of spare parts 

Modifications of the system are not permitted. Genuine spare parts and accessories authorized by the manu-
facturer ensure greater safety. Liability for damage or loss may be voided if non Lutz-Jesco parts are used.

1.9  Impermissible modes of operation

The operational safety of the product supplied can only be guaranteed when it is used in conformity with its 
intended use as specified in our contract documents-, especially the order confirmation. The limit values speci-
fied in these documents must never be exceeded. 

Содержание C 2213

Страница 1: ...Regulator for Chlorine Gas Operation Maintenance Instructions Read these operation and maintenance instructions before start up To be held for future reference Dosing Conveying Control Liquids Gases...

Страница 2: ...vacuum regulator 8 3 1 Chlorine Gas 8 3 2 Vacuum regulator 8 3 3 Technical data 9 3 4 Dimensions 10 4 General 11 5 Installation 12 5 1 Chlorine delivery 12 5 2 Design of the piping system 15 5 3 Inst...

Страница 3: ...nce can lead to death or extremely serious injury CAUTION Refers to a potentially hazardous situation Non compliance can lead to minor injury or property damage NOTICE Appears in conjunction with safe...

Страница 4: ...ns for installation maintenance and inspection The owner must ensure that all maintenance inspection and installation work is undertaken by authorized and duly qualified skilled personnel who have als...

Страница 5: ...installation and maintenance of pumps piping hoses and accessories should wear this protective equipment Before working on the dosing systems and plant disconnect it from the mains supply and protect...

Страница 6: ...and regional regulations These must be available on site The devices system must be checked daily and after each maintenance or repair work for leak tightness DANGER Leakages may cause a chlorine gas...

Страница 7: ...t to miss small parts Immediately compare the scope of delivery to the delivery note If there are any discrepancies contact your local distributor Carefully check the delivery before installation and...

Страница 8: ...r used as pressure reducing valve is of central importance for the safety in vacuum installations For this reason the C 2213 version has been designed in accordance with the latest findings The device...

Страница 9: ...g h For this purpose the flow limiter can easily be removed As a standard the flow limiter is an integrated part of the delivery Residual pressure preservation While emptying the chlorine cylinder the...

Страница 10: ...10 Operation Manual C 2213 General 3 4 Dimensions 108 142 218 169 Fig 2 Dimension C 2213...

Страница 11: ...nadmissably high chlorine delivery rate Tab 2 Components and functions All other components like the safety blowdown valve the flow meter and the ejector are realised as stand alone products Thus a fl...

Страница 12: ...xtracts water out of the vaseline so that it hardens All units must be mounted in the position that is shown in the installation examples Otherwise malfunction or even damage of the units caused by li...

Страница 13: ...that the escape of chlorine gas is avoided 5 1 3 Vacuum batteries after DIN 19606 Typical installation example Fig 4 Schematic diagram of a vacuum cylinder battery This type of installation after DIN...

Страница 14: ...r pressure directly depends on the temperature the temperature must be equally high in all cylinders So please make sure that the cylinders are not located near an radiator or close to a window where...

Страница 15: ...nge mainly plastic pipes are installed 5 2 1 Overpressure pipes Chlorine gas metering units are perfectly suitable for gaseous chlorine However liquid chlorine chemically attacks the unit Therefore th...

Страница 16: ...years at the latest 5 2 2 Vacuum lines As vacuum lines inelastic PVC pipes and flexible PE tubes are used PVC hoses are not suitable for vacuum Fabric reinforced hoses which should be vacuum proof ar...

Страница 17: ...ines The total value of the chlorine gas flow is decisive for the line dimensioning If for example the line is divided into two lanes directly in front of the ejectors the long lane must be dimensione...

Страница 18: ...r on the wall holder For cylinder mounted vacuum regulators a PVC wall connector is mounted above the chlorine cylinder At this the vacuum regulator will be mounted during the cylinder changing and th...

Страница 19: ...quite reasonable to run the blowoff connection close to the gas sensor so that in the case of malfunction an alarm signal can be released immediately The integration of an activated carbon cartridge a...

Страница 20: ...mmediately 6 1 2 Vacuum lines Leaking vacuum lines are not noticed during normal operation as chlorine gas does not escape but only ambi ent air is primed However at the same time humidity enters the...

Страница 21: ...ate possible residual chlorine amounts using the ejector until the ball in the flow meter lies still Unscrew the union nut of the cylinder connection and remove the old flat gasket Attention Do not da...

Страница 22: ...r tight The protection cap for the connection thread must be slipped on Dismount at least the vacuum regulators from unheated or humid rooms and keep them dry If possible dismantle all units and servi...

Страница 23: ...tly suited Before remounting the components make sure that they are dry Gaskets and diaphragms should be wetted slightly using silicone grease The seals on the inlet valve must be dry when fitted Pres...

Страница 24: ...holder have an M5 internal thread The felt filter can be pushed out through the cylinder connection using a thin screw driver or wire Fig 15 Inlet valve of C 2213 The articles are included in the main...

Страница 25: ...should be greased with fitting grease or sprayed with Teflon and tightened crosswise until the gap of the inlet valve housing is closed Before mounting the diaphragm to the diaphragm disc the diaphra...

Страница 26: ...bubbles must rise After the check the inlet valve is dried thoroughly and then inserted into the vacuum part by turning it slightly The O ring has to be lubricated with silicone grease The four screw...

Страница 27: ...d Ejector with non return valve and water supply Procedure Mount the vacuum regulator with flat gasket to the wall holder and connect the vacuum tubing with the flow meter The flow limiter is mounted...

Страница 28: ...ompletely open the adjustment valves of all flow meters mounted for adjustment Reduce flow rate of central flow meter to approx 200 g h for every connected vacuum regulator Set all flow meters to the...

Страница 29: ...roducing a vacuum using the ejector while the chlorine cylinder is closed For this purpose a transparent tubing is connected to the blowoff connector centric connector with the other end immersed in w...

Страница 30: ...sure if necessary High back pressure at ejector resulting from incorrect running of solution line Optimize solution line avoid sharp bends and cross sectional contractions possibly caused by excessive...

Страница 31: ...d uniformly Conditions for simultaneous delivery not provided See section INSTALLATION Chlorination plant designed for much higher metering capacities than actually required As a result the delivery r...

Страница 32: ...holder is used to receive the chlorinator while cylinder is exchanged and closes the pressure connection at the same time Thus the entry of humid air is avoided effectively also during replacement of...

Страница 33: ...gas flow is adjusted using the needle valve of the flow meter The flow meter is fixed anywhere in line between the full vacuum chlorinator and the ejector non return valve Twofold or threefold flow m...

Страница 34: ...t hout mounting plate 1 25 2 25100001 25100009 4 80 2 25100002 25100010 10 200 1 25100003 25100011 25 500 1 25100004 25100012 50 1000 0 25100005 25100013 100 2000 0 25100006 25100014 125 2500 0 251000...

Страница 35: ...value of this differential pressure has been chosen so that it slightly exceeds the minimum repsonse pressure of the safety valve Even in the case of creeping chlorine leakage at the full vacuum chlor...

Страница 36: ...a chlorine cylinder b vacuum regulatorC 2213 c safety blowdown valve d activated carbon cartridge e vacuum manifold and f Changeover unit C 7522 12 2 Manifold with one vacuum regulator for each cylin...

Страница 37: ...lve 3 Pressure reducing valve with pressure gauge 4 Dirt trap 5 Solenoid valve 6 vacuum changeover switch 7 Ejector 8 Ejector non return valve 9 Control valve C 7700 10 Flow meter rather distribution...

Страница 38: ...Standard 24087596 1x MAX close contact 24087597 1x MIN close contact 24087598 Maintenance kit for safety blow off valve 1 diaphragm 1 valve seat 33390 Maintenance kit for back stop 2 O rings 1 ball 1...

Страница 39: ...certify that the product has been cleaned thoroughly inside and outside before returning that it is free from hazardous material i e chemical biological toxic flammable and radioactive material and th...

Страница 40: ...006 42 EC Appendix II B Ondergetekende Lutz Jesco GmbH Am Bostelberge 19 30900 Wedemark bevestigt dat het volgende genoemde apparaat in de door ons in de handel gebrachte uitvoering voldoet aan de eis...

Страница 41: ...ate Address Contact person Manufacturer order no Date of delivery Device type Serial number Nominal capacity nominal pressure Description of fault Service conditions of the device Point of use system...

Страница 42: ...42 Operation Manual C 2213 Warranty Application...

Страница 43: ...Warranty Application Operation Manual C 2213 43...

Страница 44: ......

Отзывы: