Step # 4
REMOVING SECTION # 4 FROM THE MAIN CABINET
Once you have removed the 10 machine screws (2 screws on the
front, left and right, 4 top screws on the back alignment plate) -You
can lift and remove the header from the main cabinet.
DANGER
JET RECOMMENDS THE USE OF FOUR ABLE BODIES
ADULTS TO REMOVE THE HEADER
Check Box When This Step is Complete
Step # 5
INSTALLING SECTION # 3 HEADER ONTO THE MAIN CABINET
Use FOUR able bodied persons to lift the section #3 header onto the
main cabinet. Make sure the wiring connections are pushed inside
the header to keep from damaging the wiring when it is placed on
the main cabinet.
Make sure to lift the unit over the cabinet and not
slide the Section #3 so you do not scratch the cabinet. Once it is on
top of the main cabinet - position it so it lines up with the back
alignment brackets.
DANGER
JET RECOMMENDS THE USE OF FOUR ABLE BODIES
ADULTS TO ATTACH SECTION # 3
Check Box When This Step is Complete
Step # 6
SECURING SECTION # 3 HEADER TO THE MAIN CABINET
Once the header is aligned to the top of the main cabinet, screw in the
four top screws in the alinement brackets on the back of the game
and then the six M6 screws (2 on the front, left and right bottom lip)
that were removed when unbolting the section #4 from the main
cabinet.
Check Box When This Step is Complete
INSTALLATION INSTRUCTIONS
JET Games
Kahuna's Big Wave Service Manual
13