Check Box When This Step is Complete
INSTALLATION INSTRUCTIONS
Step # 25
CONNECT THE GAME TO A PROPERLY RATED AC OUTLET
Locate the power cable in the spare parts box and insert it into the
power switch assembly in the rear of the game. Insert the other end
into a properly rated and grounded outlet.
DANGER
ALWAYS INSPECT AND REPLACE DAMAGED
ELECTRICAL CORDS. DO NOT ATTEMPT TO USE OR FIX
A DAMAGED CORD
Check Box When This Step is Complete
Step # 26
POWERING ON THE GAME
Turn the power switch to ON. The game should start and run after the
computer goes thought its diagnostic process. This could take up to
two minutes while Windows loads and the software starts. Once the
software loads, it will go through its own diagnostic process.
Check Box When This Step is Complete
Step # 27
LOADING BALLS INTO THE GAME
Once the game is turned on and the blower fans are running, load
only 5 balls into each side (left and right). It is important you load one
ball at a time to allow the ball to move up the blower tube before
loading another ball. Once there are 5 balls in each side and windows
has loaded you are ready to play and installation process is complete.
JET Games
Kahuna's Big Wave Service Manual
20