
24
Hydra user manual
General operation
DANGER! DO NOT operate the Hydra until you have read and observed all the precautions listed
under “Safety information” on page 3.
Before applying power to the Hydra, verify the following:
• the base and head are safely installed and meet the location requirements stated on page 11
• the operator is familiar with, and able to comply with, the requirements for safe operation listed on pages 3
• the smoke fluid is one of the genuine Jem fluids listed under “Smoke fluid options” on page 15
• the base and heads are electrically grounded (earthed)
• the AC power distribution circuits and lines are adequately dimensioned for the current load
• the fluid line is fully assembled and closed
Follow the steps below to start the Hydra for the first time, after it has been installed and the fluid and data
lines have been connected as described in this manual.
1. Disconnect the DMX cable from the DMX input socket on the rear panel of the base, if present.
2. Set the pump enable switch on the base control panel to the “O” (off) position.
3. Connect the base to AC power and set the base power switch to the left (on) position.
4. Apply power to the smoke heads and set their power switches to the on position. Allow the heads 10 - 15
minutes to reach operating temperature.
5. Equip the base with two fresh tanks of approved fluid as described under “Filling the Hydra” on page 15.
6. Set the head temperature as described under “
(head temperature) setting” on page 20.
7. Set the number of heads in the system as described under “
(head number) setting” on page 18.
8. Set the desired fluid control option as described under “
(fluid control) setting” on page 18.
9. Verify that all heads are ready as described under “
(head status) readout” on page 21.
10.Verify that the fluid line is closed.
11.Set the pump enable switch to the “I” (on) position.
12.Prime the base as described under “Priming the base” on page 26.
13.Select the left or right fluid tank as described under “
(tank selection) setting” on page 18.
14.Fill and prime the fluid line as described under “Priming the fluid line” on page 26.
15.The Hydra is ready for use. To operate, refer to “Generating smoke”, below.
Follow the steps below to start the Hydra once it has been commissioned and tested.
1. Connect the base to AC power and set the base power switch to the left (on) position.
2. Apply power to the smoke heads. Allow 10 - 15 minutes to reach operating temperature. (If the heads are
left on and connected to AC power, the heat exchangers switch on when the base is switched on.)
3. Check the fluid tanks. Refill with an approved Jem fluid and prime as required. If changing to a different
fluid, please see “Transition between fluid types” on page 15.
4. Verify that head temperature setting is correct for the selected fluid.
5. Set the pump enable switch to the “I” (on) position.
6. Verify that the heads are ready as described under “
(head status) readout” on page 21.
P r e - o p e r a t i o n c h e c k s
S t a r t i n g t h e H y d r a f o r f i r s t t i m e
N o r m a l s t a r t p r o c e d u r e
Содержание MARTIN Hydra
Страница 1: ...Hydra user manual TM ...
Страница 35: ......
Страница 36: ...www martin com Olof Palmes Allé 18 8200 Aarhus N Denmark Tel 45 8740 0000 Fax 45 8740 0010 ...