
45/122
STANDING RIGGING
Your JEANNEAU dealer was responsible for stepping the mast of your boat.
To mast or unstep the mast yourself, proceed as follows:
BEFORE MAST INSTALLATION
- Protect the mast against possible chafing by the crane hook and cable.
- Tie down the shrouds and all the riggings to the base of the mast with a lashing long enough to
guide the mast heel when stepping the mast.
- Protect the spreader end fittings and the roller furler drum.
- Put a rope of about 1,50 m with an eye and thimble at both ends and covered with rags round the
mast. Place the rope under the second tier of spreaders. Link together both thimbles (that are ahead
of the mast) with a shackle large enough to receive the crane hook. Raise the whole till it is taut
under the spreader bases.
DURING MAST INSTALLATION
- Take the necessary steps to avoid damaging the mast head equipments.
- Use the backstay and lashing at the base of the mast to control the handling.
- Make sure the base of the mast integrally bears on its base plate.
DANGER
Before you lift the mast, make sure you have room that is clear enough
(Risk of electrocution when in contact or near electric cables).
5
RIGGING AND SAILS
Содержание SUN ODYSSEY 49 DS
Страница 1: ...SUN ODYSSEY 49 OWNER S MANUAL C ROISIERE...
Страница 2: ......
Страница 8: ......
Страница 9: ...5 122 5 1 3 5 2 ISO 10 240 SPECIFICATIONS AND WARRANTY YOUR BOAT TERMS AND CONDITIONS OF WARRANTY 1...
Страница 16: ......
Страница 26: ...22 122 5 3 3 h ISO 10 240 EMERGENCY TILLER...
Страница 28: ......
Страница 30: ......
Страница 36: ......
Страница 37: ...33 122 5 3 5 4 5 5 ISO 10 240 DECK NAVIGATION MOORING TOWING ANCHORING MAINTENANCE OF THE DECK STEERING GEAR 4...
Страница 42: ......
Страница 46: ......
Страница 47: ...43 122 5 3 5 4 5 5 ISO 10 240 RIGGING AND SAILS STANDING RIGGING RUNNING RIGGING WINCHES SAIL SETTING SAILS 5...
Страница 50: ......
Страница 62: ......
Страница 68: ......
Страница 69: ...65 122 5 3 5 4 5 5 ISO 10 240 ACCOMMODATIONS MAINTENANCE FABRICS 6...
Страница 70: ...66 122 5 3 1 ISO 10 240 3 CABINS 2 WASH ROOMS 4 CABINS 3 WASH ROOMS 4 CABINS 4 WASH ROOMS...
Страница 72: ......
Страница 78: ......
Страница 90: ......
Страница 92: ......
Страница 96: ......
Страница 98: ......
Страница 100: ...96 122 5 3 3 b 5 5 1 ISO 10 240 SHORE POWER...
Страница 102: ......
Страница 108: ...104 122 5 3 2 5 3 3 k 5 3 3 l 5 5 1 ISO 10 240 IN BOARD ENGINE 1 Filter for engine cooling water...
Страница 110: ...106 122 5 3 2 5 3 3 k 5 3 3 l 5 5 1 ISO 10 240 IN BOARD ENGINE 2 Thru hull fitting with engine water inlet valve...
Страница 116: ......
Страница 117: ...113 122 5 2 5 3 5 4 ISO 10 240 LAUNCHING LAUNCHING RECOMMENDATIONS STEPPING THE MAST 10...
Страница 120: ......
Страница 121: ...117 122 5 3 5 4 5 5 ISO 10 240 WINTER STORAGE LAYING UP PROTECTION AND MAINTENANCE 11...
Страница 124: ......
Страница 126: ......