
115/122
HOISTING
- Install a fore rope, a rear rope and fenders.
- When craning, check that no device is crushed by the belts (sounder, speedometer, shaft, etc.).
- Mark the belt position with adhesive tape on the toe rail (most of the boats are already fitted with
these stickers). The belt position will be useful during the craning for a future launching.
- The crane hook will be fitted with a gantry or a spacer with two belts. The belts shall not be hooked
directly on the hook, since it would result in unusual compressive stresses on the hull.
- Hoist slowly. Control the movement of the boat with ropes.
AFTER LAUNCHING
- Check the sounder and speedometer fittings for tightness if need be.
- Open the valves and make sure that they are tight with the hull and relevant hose.
- Check the stuffing box for watertightness (Refer to chapter 9 "Stuffing box").
- Before starting the engine, refer to chapter 9 "Engine".
STEPPING THE MAST
Refer to chapter 5 "Rigging and Sails".
WARNING
Do not stay on board or under the boat during hoisting.
10
LAUNCHING
Содержание SUN ODYSSEY 49 DS
Страница 1: ...SUN ODYSSEY 49 OWNER S MANUAL C ROISIERE...
Страница 2: ......
Страница 8: ......
Страница 9: ...5 122 5 1 3 5 2 ISO 10 240 SPECIFICATIONS AND WARRANTY YOUR BOAT TERMS AND CONDITIONS OF WARRANTY 1...
Страница 16: ......
Страница 26: ...22 122 5 3 3 h ISO 10 240 EMERGENCY TILLER...
Страница 28: ......
Страница 30: ......
Страница 36: ......
Страница 37: ...33 122 5 3 5 4 5 5 ISO 10 240 DECK NAVIGATION MOORING TOWING ANCHORING MAINTENANCE OF THE DECK STEERING GEAR 4...
Страница 42: ......
Страница 46: ......
Страница 47: ...43 122 5 3 5 4 5 5 ISO 10 240 RIGGING AND SAILS STANDING RIGGING RUNNING RIGGING WINCHES SAIL SETTING SAILS 5...
Страница 50: ......
Страница 62: ......
Страница 68: ......
Страница 69: ...65 122 5 3 5 4 5 5 ISO 10 240 ACCOMMODATIONS MAINTENANCE FABRICS 6...
Страница 70: ...66 122 5 3 1 ISO 10 240 3 CABINS 2 WASH ROOMS 4 CABINS 3 WASH ROOMS 4 CABINS 4 WASH ROOMS...
Страница 72: ......
Страница 78: ......
Страница 90: ......
Страница 92: ......
Страница 96: ......
Страница 98: ......
Страница 100: ...96 122 5 3 3 b 5 5 1 ISO 10 240 SHORE POWER...
Страница 102: ......
Страница 108: ...104 122 5 3 2 5 3 3 k 5 3 3 l 5 5 1 ISO 10 240 IN BOARD ENGINE 1 Filter for engine cooling water...
Страница 110: ...106 122 5 3 2 5 3 3 k 5 3 3 l 5 5 1 ISO 10 240 IN BOARD ENGINE 2 Thru hull fitting with engine water inlet valve...
Страница 116: ......
Страница 117: ...113 122 5 2 5 3 5 4 ISO 10 240 LAUNCHING LAUNCHING RECOMMENDATIONS STEPPING THE MAST 10...
Страница 120: ......
Страница 121: ...117 122 5 3 5 4 5 5 ISO 10 240 WINTER STORAGE LAYING UP PROTECTION AND MAINTENANCE 11...
Страница 124: ......
Страница 126: ......