37/142
MOORING LINES
A sufficient number of mooring lines suitably sized and suitable for the environment
shall be on board for mooring your boat.
- Always manoeuvre your boat using the engine.
- Make allowance for the current and wind when you handle your boat.
- Protect your boat to the highest degree with suitably sized fenders.
- Always keep the mooring ropes unfouled and stored away.
- Handle your boat at a reduced speed.
- Always pass the mooring rope through the fairlead intended for this purpose.
AFTER MOORING
- Protect the mooring lines against chafing with plastic sleeves.
- Make allowance for the variations in tides if need be.
TOWING
TOWING BOAT
- Tow another boat at a reduced speed and as smoothly as you can.
- Pay particular attention when you throw or catch the towing rope (it may foul on the
propeller).
Note: The stability may be reduced when you tow a boat.
TOWED BOAT
- Keep steering your boat and see to it that you stay in the wake of the towing boat.
- Inappropriate towing can damage your vessel, do not tow at more than 6 knots.
DANGER
- Don't try to stop the boat with your foot, your hand or a boat hook.
4
DECK
Содержание SUN ODYSSEY 45DS
Страница 1: ...SUN ODYSSEY 45DS OWNER S MANUAL C ROISIERE 134913 Index H...
Страница 2: ......
Страница 4: ......
Страница 8: ......
Страница 10: ......
Страница 12: ......
Страница 13: ...9 142 SPECIFICATIONS AND WARRANTY TECHNICAL SPECIFICATIONS CERTIFICATION CONSTRUCTION YOUR BOAT 1...
Страница 18: ......
Страница 24: ...20 142...
Страница 32: ...28 142 13 19 17 18 12 11 15 14 16...
Страница 35: ...31 142 HULL MAINTENANCE OF THE HULL LIFTING 3...
Страница 38: ......
Страница 49: ...45 142 STEERING SYSTEM STEERING GEAR 5...
Страница 52: ......
Страница 53: ...49 142 RIGGING AND SAILS STANDING RIGGING RUNNING RIGGING WINCHES SETTING THE SAILS SAILS 6...
Страница 54: ...50 142 STANDING RIGGING Reference Designation Number 1 Forestay 1 2 Backstay 2 3 V2 D3 2 4 V1 2 5 D2 2 6 D1 2...
Страница 66: ......
Страница 67: ...63 142 INTERIOR INTRODUCTION INTERIOR MAINTENANCE MAINTENANCE OF FABRICS 7...
Страница 73: ...69 142 WATER AND SEWAGE WATER WATER TANKS WATER SYSTEM DISTRIBUTION WATER SYSTEM DRAINAGE SEWAGE 8...
Страница 74: ...70 142...
Страница 76: ......
Страница 79: ...75 142 WATER SYSTEM DISTRIBUTION 8 WATER AND SEWAGE WATER...
Страница 82: ...78 142 A DETAIL A B DETAIL B C DETAIL C 4 5 6 7 1 2 3 4 7 8 9 2 1 6 3 4 5 10 5...
Страница 86: ......
Страница 91: ...87 142 GAS GAS SYSTEM 9...
Страница 93: ...89 142 ELECTRICAL EQUIPMENT GENERAL INFORMATION 12 24 V DC SYSTEM 110 230 V AC SYSTEM ELECTRICITY 10...
Страница 102: ...98 142 EARTH The line shafting bracket takes the conductive parts on board Access Under the bed Starboard aft cabin...
Страница 107: ...103 142 ENGINE GENERAL INFORMATION ENGINE FITTING MAINTENANCE 360 DOCKING VERSION 11...
Страница 108: ...104 142 ENGINE FITTING...
Страница 109: ...105 142 DIAGRAM LOCATION 11 ENGINE...
Страница 112: ......
Страница 136: ...132 142 10 Layout diagram...
Страница 137: ...133 142 LAUNCHING LAUNCHING RECOMMENDATIONS STEPPING THE MAST 12...
Страница 138: ...134 142 POSITION OF HOISTING CRADLE AND STRAPS Note Measurements are expressed in mm...
Страница 141: ...137 142 WINTER STORAGE LAYING UP PROTECTION AND MAINTENANCE 13...
Страница 144: ......
Страница 146: ......