11/142
CERTIFICATION
DEFINITION OF DESIGN CATEGORIES:
The SUN ODYSSEY 45DS model conforms to the directive 2003/44/CE.
CONSTRUCTION
Your boat is built in GRP.
The inner moulding that is stuck and laminated to the hull distributes the stresses over the
whole bottom surface. The iron ballast is fastened to the hull with bolts and backing plates.
The deck is stratified and has hardwood inserts at the points of fixtures and fastenings. The
deck to hull joint is made of a polyurethane filler and it is reinforced by the fastening of the teak
foot strap.
CE Category
Persons Maximum
A
8 persons
B
12 persons
C
14 persons
D
14 persons
Design category
Wind force
(Beaufort scale)
Significant height of waves
to be considered
(,in metres H 1/3)
Vessel designed for navigation:
A - "At high sea"
B - "In open sea"
C - "Near to the coast"
D - "In sheltered waters"
Over 8
Up to and including 8
Up to and including 6
Up to and including 4
Over 4 m
Up to and including 4 m
Up to and including 2 m
Up to and including 0,5 m
1
SPECIFICATIONS AND WARRANTY
Содержание SUN ODYSSEY 45DS
Страница 1: ...SUN ODYSSEY 45DS OWNER S MANUAL C ROISIERE 134913 Index H...
Страница 2: ......
Страница 4: ......
Страница 8: ......
Страница 10: ......
Страница 12: ......
Страница 13: ...9 142 SPECIFICATIONS AND WARRANTY TECHNICAL SPECIFICATIONS CERTIFICATION CONSTRUCTION YOUR BOAT 1...
Страница 18: ......
Страница 24: ...20 142...
Страница 32: ...28 142 13 19 17 18 12 11 15 14 16...
Страница 35: ...31 142 HULL MAINTENANCE OF THE HULL LIFTING 3...
Страница 38: ......
Страница 49: ...45 142 STEERING SYSTEM STEERING GEAR 5...
Страница 52: ......
Страница 53: ...49 142 RIGGING AND SAILS STANDING RIGGING RUNNING RIGGING WINCHES SETTING THE SAILS SAILS 6...
Страница 54: ...50 142 STANDING RIGGING Reference Designation Number 1 Forestay 1 2 Backstay 2 3 V2 D3 2 4 V1 2 5 D2 2 6 D1 2...
Страница 66: ......
Страница 67: ...63 142 INTERIOR INTRODUCTION INTERIOR MAINTENANCE MAINTENANCE OF FABRICS 7...
Страница 73: ...69 142 WATER AND SEWAGE WATER WATER TANKS WATER SYSTEM DISTRIBUTION WATER SYSTEM DRAINAGE SEWAGE 8...
Страница 74: ...70 142...
Страница 76: ......
Страница 79: ...75 142 WATER SYSTEM DISTRIBUTION 8 WATER AND SEWAGE WATER...
Страница 82: ...78 142 A DETAIL A B DETAIL B C DETAIL C 4 5 6 7 1 2 3 4 7 8 9 2 1 6 3 4 5 10 5...
Страница 86: ......
Страница 91: ...87 142 GAS GAS SYSTEM 9...
Страница 93: ...89 142 ELECTRICAL EQUIPMENT GENERAL INFORMATION 12 24 V DC SYSTEM 110 230 V AC SYSTEM ELECTRICITY 10...
Страница 102: ...98 142 EARTH The line shafting bracket takes the conductive parts on board Access Under the bed Starboard aft cabin...
Страница 107: ...103 142 ENGINE GENERAL INFORMATION ENGINE FITTING MAINTENANCE 360 DOCKING VERSION 11...
Страница 108: ...104 142 ENGINE FITTING...
Страница 109: ...105 142 DIAGRAM LOCATION 11 ENGINE...
Страница 112: ......
Страница 136: ...132 142 10 Layout diagram...
Страница 137: ...133 142 LAUNCHING LAUNCHING RECOMMENDATIONS STEPPING THE MAST 12...
Страница 138: ...134 142 POSITION OF HOISTING CRADLE AND STRAPS Note Measurements are expressed in mm...
Страница 141: ...137 142 WINTER STORAGE LAYING UP PROTECTION AND MAINTENANCE 13...
Страница 144: ......
Страница 146: ......