P/N 960-000164R_Rev. 3 {EDP #213631}
© 2018, JAPAN CASH MACHINE CO., LTD.
2 - 2 4
Section 2
iPRO-RC™ Series Banknote Recycler
Installation
Operational Flowchart (Continued)
Figure 2-22 depicts a typical iPRO-RC™ Retrieving flow process.
Figure 2-22
Figure 2-22
iPRO-RC Operational Flowchart (Retrieving)
B3) Return from the Figure 2-16 “Primary Sequence”
Flow chart on page2-18 of this Service Manual
b) Is a Banknote being dispensed from the Recycler
Unit?
a) Transporting the Banknote
C3) To the Figure 2-23 “Retrieving/Cash Box” Flow
on page2-25 of this Service Manual
c) Stop transportation