Lecture Notes

DBV-500 Banknote Validator

JCM® Training Overview

November, 2016

PERFORMANCE TESTING PROCEDURES

P

ERFORMANCE

 T

ESTING

Available Tests Using the JCM Tool Suite Application

Transport Motor Normal Rotation

Transport Motor Reverse Rotation

Stacking

Sensor  Test

DIP Switch 1 Test

DIP Switch 2 Test

LED  Test

Centering  Test

To run Performance Tests, proceed as follows:

1. Disconnect the DBV-500 Unit from its power source.
2. Remove the DBV-500 Unit’s Cash Box to access the Maintenance USB Port.
3. Set DIP Switch Block #1, Switch #8 ON.
4. Reconnect the DBV-500 Unit to its power source.
5. Connect a USB Type-A to Mini-B cable between the PC’s USB Port and the 

DBV-500 Maintenance USB Port.

6. Launch the 

“JCM Tool Suite Standard Edition”

 software application.

7. Click the 

Service Mode

 drop-down menu (Figure 5), then select 

Performance Test

 

(refer to Figure 7 on the following page). 

8. Click on the desired Performance Test in the left column (e.g., 

STACK TEST

).

9. Click the 

“Start”

 

 Screen Button to begin the Performance Test. 

Test Results are displayed in the Performance Test window (right column).

10.Click the 

“Stop” 

Screen Button to end the selected Performance Test.

NOTE: Additional tests are available using DIP Switch Performance Testing 
Procedures.

NOTE: Repeat Steps 8 through 10 above to run additional Performance Tests.

Содержание DBV Series

Страница 1: ...000187R_Rev A November 2016 2016 JCM American Corporation Phone 800 683 7248 702 651 0000 Fax 702 651 0214 E mail support jcmglobal com www jcmglobal com JCM TRAINING OVERVIEW DBV Series DBV 500 Bankn...

Страница 2: ...Default Color Setting 7 Sensor and Roller Cleaning Procedure 8 JCM Tool Suite Standard Edition 9 Software Download Procedures 10 Performance Testing Procedures 12 Performance Testing 12 Available Tes...

Страница 3: ...e Notes OVERVIEW This training course addresses the following JCM DBV 500 device versions DBV 500 SD UNIT Figure 1 illustrates the DBV 500 SD Banknote Validator Unit Table 1 DBV 500 Banknote Validator...

Страница 4: ...BV 500 Component Names and Locations n m l k e Option Items b c a d g f j h i Figure 2 DBV 500 Component Names a Bezel b Full Color Indicator c Transport Unit d Cash Box e Cash Box Latches f Unit Guid...

Страница 5: ...e DBV 500 DIP Switch Block 1 Table 2 DIP Switch Block 1 Configuration Settings See the Software Information Sheet SIS for proper Switch Settings Switch No Switch ON Switch OFF 1 VEND 1 INHIBIT VEND 1...

Страница 6: ...Table 3 DIP Switch Block 2 Configuration Settings Default Switch No DIP Switch 2 For correct DIP Switch Block 2 Settings for other protocols check the Software Information Sheet SIS for the specific p...

Страница 7: ...iguration 6 Remove power from the DBV 500 Banknote Validator Unit 7 Reset all DIP Switch settings on DIP Switch Block 1 and Block 2 to the original settings NOTE Before changing settings record the cu...

Страница 8: ...V 500 Sensor and Roller Cleaning Methods Label Sensor Description Cleaning Method a Entrance Sensor b Centering Start Sensor c Side Sensor d COB Sensor e Exit Sensor NOTE DO NOT use Alcohol solvents c...

Страница 9: ...s Sensor Adjustment Performance Test Event Log View Use a Standard USB Type A to Mini B Cable between the PC and DBV 500 1 Remove the Cash Box 2 Connect the Mini B cable to the USB Port by the DIP Swi...

Страница 10: ...gure 6 2 To select the file to download click Browse Figure 6 a 3 From the folder that contains the DBV 500 download file click the DBV 500 Download file name then click the Open screen button The JCM...

Страница 11: ...ed for the Download and remove power from the DBV 500 Unit 7 Set the DIP Switches on the DBV 500 Unit to the Operational position Figure 6 Downloader Suite Display d c a b NOTE If the DBV 500 Software...

Страница 12: ...Switch 8 ON 4 Reconnect the DBV 500 Unit to its power source 5 Connect a USB Type A to Mini B cable between the PC s USB Port and the DBV 500 Maintenance USB Port 6 Launch the JCM Tool Suite Standard...

Страница 13: ...R_Rev A 2016 JCM American Corporation 1 3 November 2016 JCM Training Overview DBV 500 Banknote Validator Lecture Notes The Performance Test window appears as shown below Figure 7 JCM Tool Suite Perfor...

Страница 14: ...ce Tests Using DIP Switch Settings Test Item DIP Switch Block 1 Settings Test Description 1 2 3 4 5 6 7 8 DIP Switch Block 1 Switch 8 Setting OFF to start Test ON to stop Test Transport Motor Normal R...

Страница 15: ...Table 7 Sensor and LED Condition If multiple sensors are active the status of the sensor with lowest priority is shown Sensor Name Condition LED Entrance Sensor Shielded RED Centering Sensor Shielded...

Страница 16: ...the DBV 500 Unit 2 Set DIP Switch Block 1 Switch 8 to ON 3 Restore power to the DBV 500 Unit 4 Connect the USB Type A to Mini B cable between your PC s USB port and the USB port located on the DBV 50...

Страница 17: ...ed to Change Serial Number click Yes if the Serial Number recorded on the CPU Circuit Board needs to be changed otherwise click No to complete Calibration 11 When the Sensor Calibration Screen appears...

Страница 18: ...e DBV 500 Unit 2 Set DIP Switch Block 1 Switch 8 to ON 3 Restore power to the DBV 500 Unit 4 Connect the USB Type A to Mini B cable between your PC s USB port and the USB port located on the DBV 500 U...

Страница 19: ...he Start button Figure 12 a to begin the DBV 500 White Level Test 10 When the White Level Test is complete click the Close box Figure 13 a to close the White Level Test Screen and complete the process...

Страница 20: ...ble 8 DBV 500 Startup Errors Causes and Solutions Normal Operation Performance Test Error Causes and Solutions White 1 White 1 Boot Check Boot Program incorrectly written CPU Board White 3 White 2 Boo...

Страница 21: ...ns Normal Operation Performance Test Error Causes and Solutions Red 3 Red 1 Stacker Motor Lock Stacker Motor Speed Error Red 3 Red 2 Pusher Position Pusher Mechanism is not at Home Position Red 3 Red...

Страница 22: ...tern detected clean calibrate Yellow 3 Yellow 5 Photo Level Sensor levels incorrect clean calibrate Yellow 3 Yellow 6 Banknote Length Banknote longer shorter than specified clean rollers Yellow 3 Yell...

Страница 23: ...187R_Rev A 2016 JCM American Corporation 2 3 DBV 500 Banknote Validator JCM Training Overview November 2016 Lecture Notes PERSONAL NOTES AND COMMENTS Add relevant notes and comments regarding your ins...

Страница 24: ...Furthermore and are not always mentioned in each case throughout this publication JCM American Corporation has been accredited as an Authorized Provider by the International Association for Continuin...

Отзывы:

Похожие инструкции для DBV Series