
© 2016 JCM American Corporation
1 1
November, 2016
Lecture Notes
5. Verify that the
Host CRC
and
Device CRC
values are identical (Figure 6
d
).
6. Disconnect the USB Cable used for the Download, and remove power from the
DBV-500 Unit.
7. Set the DIP Switches on the DBV-500 Unit to the Operational position.
.
Figure 6
Downloader Suite Display
=
d
c
a
b
NOTE: If the DBV-500 Software becomes corrupted or is not installed (e.g., when
changing the CPU Circuit Board), set Forced Download Mode by setting DIP Switch
Block #1 Switches #6, #7 and #8 ON. (The DIP Switches are located behind the Cash
Box; remove the Cash Box to gain access).