background image

JC MACHINERY & TOOLS INC.                 

                        Quality We Trust 

___________________________________________________________________ 

www.jc-tool.com                              [email protected] 

VI.

 

Welding steps 

1. Setting welding parameters (see above). 

2. When the temperature reaches the set value. 

3. Welding machine positioning. 

4. Pull up the positioning handle (12) of the air gun, lift the air gun (19), lower the air nozzle (4) and 

make it close to the submerged membrane. Move the air gun to the left to insert the air nozzle into 

the overlap membrane and make the air nozzle in place. At this time, the welding machine will walk 

automatically for welding. 

5. Always pay attention to the position of the guide wheel (13) and adjust it by touching the handle 

(24) lightly if it deviates from the position. 

6. Pull up the positioning handle (12) of the air gun after welding, move the air nozzle to the right 

until it stops, and rotate upward until it is locked. 

7. After welding, press the button on the control panel at the same time 

  and     

   

and make the air gun in the state of blowing cold air to cool the air nozzle.

 

 

8. Turn off the power supply 

 

with the power switch.

   

VI.

 

Routine maintenance 

Use steel brush to clean the hot air nozzle. 
Clean the air inlet at the back of the hot air blower

Содержание JC-GM-PLUS

Страница 1: ...ACHINERY TOOLS INC Quality We Trust ___________________________________________________________________ www jc tool com info jc tool com Roof Waterproofing Membrane Welding Machine JC GM PLUS User Man...

Страница 2: ...ard because of high temperature especially near combustible materials and explosive gases 3 Don t touch heater tube and nozzle when they are hot They may cause burns Don t point hot air flow in the di...

Страница 3: ...ed in the steel packing box with screws When using the machine for the first time it is necessary to loosen three machine fixing screws and take them out to remove the machine from the packing box as...

Страница 4: ...________________________________________________ www jc tool com info jc tool com Technical Parameters Voltage 120 V Frequency 50 Hz power 2000 W Temperature 0 620 32 1148 Welding speed 1 12 m min Wel...

Страница 5: ...NC Quality We Trust ___________________________________________________________________ www jc tool com info jc tool com iii Description 19 20 21 18 22 17 23 16 24 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1...

Страница 6: ...ndle 22 Counterweight block 3 Round belt 13 Guide wheel 23 Universal wheel 4 Nozzle 14 Guide wheel support block 24 Handrail 5 Pulley 15 Hot Gun Fixed Seat 25 Clamp 6 Hot Gun Fixed Plate 16 Locator Fi...

Страница 7: ...blower starts to heat until to the setting temperature If press the bottoms 37 and 36 at the same time LCD display shows as figure 1 the hot air blower is under natural wind without heating When the w...

Страница 8: ...g speed Using bottoms Speed setting knob and Speed setting knob on the panel to set the required speed according to the welding temperature LCD display will show the set speed and the current actual s...

Страница 9: ...welder next time the welder will automatically use the last set of parameters without having to re set parameters VII Positioning the welder Pressure Lift lever 30 to lift machine move it to welding...

Страница 10: ...air nozzle and ground should be shown as figure 5 We have adjusted the distance 2 The distance between hot air nozzle and Drive roller should be shown as figure 6 We have adjusted the distance You ca...

Страница 11: ...air nozzle in place At this time the welding machine will walk automatically for welding 5 Always pay attention to the position of the guide wheel 13 and adjust it by touching the handle 24 lightly if...

Страница 12: ...JC MACHINERY TOOLS INC Quality We Trust __________________________________________________________________ www jc tool com info jc tool com...

Отзывы: