Quick Start
Connect the stand to the mains (100 - 240 V).
Insert a cartridge into the tool (1) and place it into
the charger on the stand (2).
Note:
Charge the tool completely (30 min)
before using it for the first time.
The status indicator light indicates as follows
the tool status:
2
1
Status Indicator Light
1. Connection
2. Cartridge Insertion and Charging
green
working/soldering
green blinking
charging
alternating
red/green blinking
low battery,
less than 20%
red blinking
no cartridge
no color
power OFF
4
Содержание B iRON 115T
Страница 1: ...High Precision Battery Rework Station B iRON 115T INSTRUCTION MANUAL...
Страница 16: ...Notes 16...
Страница 17: ...Notes 17 40 mm 50 mm 60 mm 80 mm 100 mm 130 mm 130 mm para manuales color gris 200 mm...
Страница 18: ...Notes 18...