NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
ROBOT
C115
C11
C105 /
C105 / C115
19:29
19:29
Port
2
Actual Temp. 25ºC
NT105
ºC
Power
45%
Selected 350ºC
350
Port
2
NT105
Hibernation
19:29
Port
2
Actual Temp. 25ºC
AN115
Hibernation
19:29
ºC
Power
45%
Selected 350ºC
350
Port
2
AN115
No
Yes
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
PORT
1
PEDAL
2
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
ROBOT
C115
C11
C105 /
C105 / C115
19:29
19:29
Port
2
Actual Temp. 25ºC
NT105
ºC
Power
45%
Selected 350ºC
350
Port
2
NT105
Hibernation
19:29
Port
2
Actual Temp. 25ºC
AN115
Hibernation
19:29
ºC
Power
45%
Selected 350ºC
350
Port
2
AN115
No
Yes
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
PORT
1
PEDAL
2
Cartridge Exchanger
Save time and change cartridges safely without switching the station off.
Place the tweezers with the
cartridge in the extractor slot
and pull to remove it.
Place the tweezers on top of
the new cartridge and gently
push the tweezers down.
Place the tweezers with the
cartridge in the slot, so that its
reference ring rests in the slot,
and gently press the cartridge
into the tweezers*.
*Important:
Push the cartridge in as far as it will go, until the reference ring rests against the
tweezers. The charging indicator light changes from red to green when the cartridge is properly
inserted.
until “stop”
1. Removing
2. Inserting
3. Fixing
Reference
Ring
Charging Indicator
Reference Ring
10
Содержание B iRON 115T
Страница 1: ...High Precision Battery Rework Station B iRON 115T INSTRUCTION MANUAL...
Страница 16: ...Notes 16...
Страница 17: ...Notes 17 40 mm 50 mm 60 mm 80 mm 100 mm 130 mm 130 mm para manuales color gris 200 mm...
Страница 18: ...Notes 18...