background image

Jason International, Inc.  •  

 

501.771.4477  

 

 

 

Page 4 of 8

  

 

 

Customer Service :  800.255.5766 

InsTallaTIOn InsTruCTIOns (cont.)

eleCTrICal

WaRNINg: 

 

Verify the electrical service to match either the 120v or 

240v systems.  Refer to the blower label for voltage and frequency 

requirements.

 

NOtE:

 The bath is designed for indoor use only. The electrical 

equipment must not be exposed to direct or indirect water 

or moisture contact. The electrical equipment must also be 

protected from dust and other airborne debris before, during, 

and after installation.
1, 

Electrical Service: 

 A licensed electrician must provide the 

electrical service protected by a dedicated GFCI (Ground 

Fault Circuit Interrupter). The location of the GFCI must 

be  at  least  five  (5)  feet  away  from  the  inside  surface 

of the bath, accessible for regular testing. 

uSE COPPER 

CONDuCtORS ONlY.

  WaRNINg:

  The  electrical  service  to  the  GFCI  must  not 

be  interrupted  by  any  control  device.  Likewise,  the  

electrical service from the GFCI to the bath control should 

be direct and not interrupted by a switch. Never use a 

switch in conjunction with a control device. This will VOID 

THE MANUFACTURER’S WARRANTY.

2.  GrOunDInG Is reQuIreD.  

 

The  unit  should  be  installed  by  a  qualified  service 

 

representative and properly grounded.

3. 

Standard Equipment.

  The Integrity

TM

 AirMasseur

®

 system 

comes equipped with a heated air blower, an air switch 

control box, air switch tubing, and a color coordinated air 

actuator.  The air switch control must be plugged into a 

dedicated 120v(volt), 20 A (amp), 60Hz (hertz) circuit with 

a service ground.  The air switch tubing must be firmly 

attached to the air switch control box and to the air switch 

actuator. A small bead of silicone may be added to the 

air  tubing  connections  to  help  prevent  the  tubing  from 

disengaging.The air switch tubing must also be installed 

to allow for a “drop loop” see 

figure 3

 on page 3.  This will 

prevent any moisture from entering the air switch control 

box from the tubing.  Finally, the blower will plug into the 

control box.  

4. 

Control box. 

 The blower is pre-wired with a 36” cord with a 

NEMA plug end. The air switch control box and tubing is 

temporarily secured to the bath’s plumbing for shipping.  

During installation the tubing must be attached to the bath’s 

air switch actuator and the air switch control box. The air 

switch control box should be relocated to its dedicated 

circuit outlet.  Connect only to a dedicated Ground Fault 

Circuit Interrupter (GFCI) protected, 120v (volt), 20A (amp), 

60Hz (hertz) circuit with a service ground.

 

DaNgER  —  RISK  Of  ElECtRIC  ShOCK:

    Connect  only  to 

a circuit protected by a Ground Fault Circuit Interrupter 

(GFCI). In the unlikely occurrence of a current imbalance 

in the power conductors, the GFCI will interrupt the power 

to the bath.

  INSTALL SERVICE CONNECTION AT LEAST 6” ABOVE 

THE SUB FLOOR

.  

The air switch control box is intended 

to be installed in a dry area and is for indoor use only. 

  DaNgER:

 

Do  not  alter  the  factory  installed  wiring. 

All 

building  materials  and  wiring  should  be  routed 

away  from  the  blower  body  or  other  heat-producing  

components of the unit.

all lOCal aND StatE ElECtRICal aND PlumbINg CODES muSt 

bE ObSERVED.

 Where there are no local codes the 

National 

Electric Code (NEC) 

and 

uniform Plumbing Code (uPC)

 shall be 

observed.  It  is  the  responsibility  of  the  installer/owner  to 

determine specific code compliance prior to installation of 

the product. 

NOtE:

 In the Commonwealth of Massachusetts, installation 

is to be done by a Massachusetts licensed plumber.

CleanInG

1. 

Remove  all  loose  debris.

    Construction  plaster  or  excess 

grout can be removed with the use of a wooden-edged 

trowel.

2. 

Paint  or  tar  stains

  can  be  removed  with  paint  thinner, 

turpentine, or isopropyl alcohol (rubbing alcohol). Never 

allow the cleaner to soak against the acrylic surface for long 

periods of time.  For general acrylic-surface cleaning, refer 

to the USER MAINTENANCE INSTRUCTIONS section 

on page 6.  

always rinse the surface immediately

 following 

the use of cleaners.

  

NOtE:  

Follow the manufacturers instructions for safe use 

of cleaning products. If the surface becomes scratched 

or  dulled,  it  may  be  restored  by  using  a  quality  plastic 

polish,  like  Novus  Plastic  Polish  No.  2  (available  from 

the  Jason  Dealer). 

 

It  is  always  preferable  to  protect  the 

acrylic  surface  during  installation  to  minimize  cleanup  and  

prevent surface damage.

waTer TesTInG

Before 

finishing the installation, it is recommended that the 

bath be water tested and the plumbing tested for leaks. 

1. 

before water testing the bath, make sure that the 

air actuator 

hose is securely engaged into the bathside air actuator 

and into the controls air switch.

2. 

fill and operate the bath.

  

Close the drain and fi

ll the bath 

with water to at least ten inches below the bath deck. The 

incoming  water  temperature  should  not  exceed  104°F 

(40°C). 

3.  Momentarily depress the Air Switch to start the blower.

4. 

Inspect the plumbing for leaks.

 

5. 

turn the blower Off and then drain the water.

  The bath unit 

and its plumbing are designed to drain after each use, 

whether used as an AirMasseur

®

 or as a soaking bath.

Содержание Integrity AirMasseur B3260

Страница 1: ... in transit is the responsibility of the carrier The owner or installer MUST open uncrate and inspect the unit for damage when it is delivered Inspect plumbing and whirlpool surface for missing or damaged components Alertthedealerofanydiscrepancies Ifdamage is discovered immediately notify the carrier in writing and request that they have a representative inspect the unit If the carrier fails to r...

Страница 2: ...d install at this time 3 Level the bath and remove packing board a Install the bath level for proper drainage Jason baths are designed to be supported under the entire base of the bath If the floor is smooth and level the bath s Level Form base will provide proper drainage and support See Figure 3 Mortar is required when the subfloor is notsmoothandlevel whenadditionalsoundinsulation is desired or...

Страница 3: ...ng any work Use 1 5 ABS or PVC plastic tubing Locatethecontrolboxwiththeblowerinanareaaccessible for servicing NOTE A 15 foot replacement air switch tube can be purchased from a Jason dealer if needed To insure proper functioning of the system avoid remote mounting in a location which requires more than six 6 piping direction changes A 90 direction change should be made up of two 45 elbows for max...

Страница 4: ...ircuitInterrupter GFCI protected 120v volt 20A amp 60Hz hertz circuit with a service ground DANGER RISK OF ELECTRIC SHOCK Connect only to a circuit protected by a Ground Fault Circuit Interrupter GFCI In the unlikely occurrence of a current imbalance in the power conductors the GFCI will interrupt the power to the bath INSTALLSERVICECONNECTIONATLEAST6 ABOVE THE SUB FLOOR The air switch control box...

Страница 5: ...or a soaking bath Blower TheJasonIntegrityTM AirMasseur systemcontainsavariable speed controlled heated air blower The blower provided is factory tested when assembled onto the bath The blower must be plugged into the air switch control box which must be plugged into its dedicated GFCI electrical service prior to turning it on Air ON OFF BUTTON The Air On Off button air switch activator allows the...

Страница 6: ...r is activated Even through all Jason IntegrityTM AirMasseur baths provide preheated air occasionally some people with sensitive skin mightexperienceacoldairsensation Thissensationiscaused by the swiftly moving heated air bubbles blowing on the wet skin This phenomenon can be related to the use of a fan for cooling on a hot day While the ambient temperature does not change the moving air makes you...

Страница 7: ...turer or supplier To obtain warranty service you must contact the retailer from which the merchandise was purchased or Company s distributor in your area Written notice of warranty defects must be given to the company within thirty 30 days from the occurrence thereof Written permission must be obtained by the retailer or distributor from the Company before any equipment claimed defective is return...

Страница 8: ...bathwhileundertheinfluenceofalcohol anticoagulants stimulants antihistamines vasoconstrictors vasodilators hypnotics narcotics or tranquilizers F Persons with a medical history of heart disease low or high blood pressure circulatory system problems or diabetes should consult a physician before using an AirMasseur bath G Persons using medication should consult a physician before using an AirMasseur...

Отзывы: