2.2 Programming of phase-correction - e.g. connection directly L-L (400V)
Adjustment of phase-correction between voltage and current in the meas. system is done
in expert mode 1 (page 14)
Example:
Meas.current: L1
Meas. Voltage L3-L2
Phase U/I [ 90°]
- 5 -
2.1 Current measurement
When installing the current converter, care should be taken to ensure that the load
current flows through it. The outputs of the compensation network must be installed
behind the current converter (in the direction of current flow). If the device is connected
up via sum-current converters, the overall conversion ratio is entered.
k
K
k
K
l
L
l
L
Feed 1
Feed 2
K L K L
Measurement via sum current converter
Prophi-6T
Current
measurement
k l
k l
Example:
C.converter 1: 1000/5A
C.converter 2: 1000/5A
Sum-current converter: 5A+5A/5A
C.converter ratio is: 2000/5A
L1 (R)
L2 (S)
L3 (T)
N
k l
T 2
A
T 2
A
PE
Ub
Um
Im
(L) (N) (L3) (L2) k l
using
meas. current
meas. voltage
phase-angle
preset
L1
L1 - N
0°
L1
L1 - L2
30°
L1 (k<->l)
L2 - N
60°
example
L1
L3 - L2
90°
L1
L3 - N
120°
L1
L3 - L1
150°
L1 (k<->l)
L1 - N
180°
L1 (k<->l)
L1 - L2
210°
L1
L2 - N
240°
L1
L2 - L3
270°
L1 (k<->l)
L3 - N
300°
L1 (k<->l)
L3 - L1
330°
Содержание Prophi 6T
Страница 21: ...Prophi 6T 21...