![J&M 275-ST Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/jandm/275-st/275-st_operators-manual_3087569015.webp)
15
1.0 Operations
12.
Position boom above boom rest and lower to allow its full weight on the boom rest.
13.
Replace lynch pin in Boom Arm.
14.
Make sure that the conveyor hold down ratchet strap is tight enough that the conveyor will not move
during transportation.
15.
Make sure the collapsible hopper is in the up position for storage (Figure 1.6).
NOTE: If you are not using an optional hopper cover this will help the water drain out of the hopper.
16.
The engine must throttle at, or above 80% throttle for 3 seconds to begin charge. After the 3 seconds at 80% throttle the
battery will continue to charge until the engine is turned off.
17.
Slide the fuel shut off lever to the “OFF” position. This will allow the engine to shutoff by running out of gas.
18.
Turn the key to the “OFF” position.
1.7 Filling Speed Tender From Another Wagon or Bulk Container
WARNING: The Speed Tender must be hooked to the towing vehicle during loading and
unloading.
1.
Remove lynch pin from Boom Arm (Figure 1.3).
2.
Start the hydraulic power unit and increase throttle speed. (Allow hydraulic fluid to warm up.)
NOTE: Make sure collapsible hopper is in the down position.
3.
Raise the boom out of boom rest using the handheld control. (Figure 1.4).
NOTE: Wireless options feature a Wireless Remote (Figure 1.4).
CAUTION:
If you are parked on an incline, the boom arm may swing freely. (It is advised
that you do not use Speed Tender on uneven ground)
5.
Rotate the conveyor to 45 deg. (Figure 1.8)
6.
Lower the boom so you can remove the telescoping spout from the discharge end of the conveyor.
7.
Undo the conveyor hold down ratchet strap (Figure 1.3).
8.
Swing the collapsible hopper end out from under the Speed Tender shell.
9.
Position the discharge end over the Speed Tender.
45 deg.
Figure 1.8
NOTE: The conveyor is equipped with a stand (Figure 1.7). (It is recommended for use whenever
possible to maximize conveyor performance and for easier access to discharge point on bulk seed
containers).
Conveyer Stand
10.
Lock the Boom Arm in place.
Figure 1.7
Содержание 275-ST
Страница 3: ...3 ...
Страница 9: ...9 Decals 4 11 13 7 12 14 9 10 11 16 15 17 ...
Страница 33: ...33 ...