13
1.0 Operations
1.6 Field Operation
WARNING: The Speed Tender must be hooked to the towing vehicle during loading and
unloading.
1.
Position the Speed Tender next to the planter/drill so the conveyor will reach the planter box.
2.
Remove lynch pin from Boom Arm. (Figure 1.3).
3.
Start the hydraulic power unit and increase throttle speed. (Allow hydraulic fluid to warm-up.)(Figure 1.2).
4.
Raise the boom out of the Boom Rest using the handheld control (Figure 1.4).
NOTE: Wireless options feature a Wireless Remote (Figure 1.4).
WARNING: When operating the hydraulic swing option, Do not stand in the operating range of the Conveyer.
5.
Check to make sure the hopper is in the up position (Figure 1.6)
Operating Range
Boom Rest
Boom Arm
Lynch Pin
Hold-Down
Ratchet Strap
Figure 1.3
Содержание 275-ST
Страница 3: ...3 ...
Страница 9: ...9 Decals 4 11 13 7 12 14 9 10 11 16 15 17 ...
Страница 33: ...33 ...