Issue: 01.08.2020
Commissioning
Controller Home Screen
Following controller power-up and initialisation process (approximately 1 minute), the controller home screen will appear as
follows:
The low pressure and high pressure conditions of the unit are displayed. If
is switched OFF on the controller. To switch the unit ON, follow instructions on
conditions can be displayed by pressing the DOWN arrow:
up and initialisation process (approximately 1 minute), the controller home screen will appear as
The low pressure and high pressure conditions of the unit are displayed. If
OFF by Key
is indicated in the lower box, then the unit
is switched OFF on the controller. To switch the unit ON, follow instructions on page 22. Further information on the system
conditions can be displayed by pressing the DOWN arrow:
Page 20
up and initialisation process (approximately 1 minute), the controller home screen will appear as
is indicated in the lower box, then the unit
Further information on the system
Содержание JEHSD-0400-B3-M-3
Страница 31: ...Issue 01 08 2020 Page 31 Dimensional Drawings JEHSD 0400 B3 M 3 JEHSD 0600 B3 M 3 JEHSD 0800 B4 M 3 ...
Страница 32: ...Issue 01 08 2020 Page 32 Electrical Wiring Diagram JEHSD 0400 B3 M 3 JEHSD 0600 B3 M 3 ...
Страница 33: ...Issue 01 08 2020 Page 33 Electrical Wiring Diagram JEHSD 0800 B4 M 3 ...
Страница 39: ...Issue 01 08 2020 Page 39 Technical Information Small Version Controller ...
Страница 41: ...Issue 01 08 2020 Page 41 Certification ...
Страница 42: ...Issue 01 08 2020 Page 42 Certification ...
Страница 43: ...Issue 01 08 2020 Page 43 Certification ...