Issue: 01.08.2020
Page 14
Installation
Field piping
To ensure satisfactory operation and performance, the following points should be noted:
•
Pipework routes must be as simple and as short as possible.
•
Avoid low points on pipework where oil can accumulate.
•
Suction gas velocity must be sufficient to ensure good oil return.
•
Use only clean, dehydrated refrigeration grade copper tube with long radius bends.
•
Avoid flare type connections and take great care when brazing. Use only silver alloy rods.
•
Run braze without over filling to ensure there is no leakage into the tube.
•
To prevent oxidation, blow oxygen free nitrogen through pipework when brazing.
•
Install insulation on all suction lines and on all pipes penetrating walls or passing through hot areas.
•
Adequately support all pipe work at a maximum of 2 metre intervals.
•
Where the condensing unit is situated below the indoor unit (coldroom evaporator / display case), the height difference
between the two units should be no more than 6 metres.
•
In vertical pipework, the use of U-trap and double suction risers is often required. These suction risers must always be fitted
with a U-trap at the bottom and a P-trap at the top and never be higher than 4m unless a second U-trap system is fitted.
•
Additional oil may be required if piping length exceeds 20m or multiple oil traps are fitted. Check the oil level closely during
commissioning and add oil as necessary. Add oil in small amounts. Do not overfill the compressor!
•
When installing a single compressor condensing unit (excluding Digital units) with multiple evaporators connected which
operate independently, care should be taken to ensure that the evaporating pressure/temperature does not fall outside the
compressor operating limit at minimum load. If there is a potential for this scenario, consider multiple evaporators fed by a
single solenoid valve or separate condensing units.
•
Suction pipework should slope gently back towards the unit to assist oil return to the compressor. A fall of approximately
2cm per metre of pipework is acceptable.
•
Liquid lines should be sized to ensure a full supply of liquid refrigerant to the expansion device. Careful attention should be
paid to sizing of liquid lines on large risers (maximum rise 6m).
•
In some circumstances, a suction accumulator (not supplied) may be required. It offers protection against refrigerant flood
back during operation and also against off-cycle migration by adding internal free volume to the low side of the system.
•
Tests must be conducted to ensure the amount of off-cycle migration to the compressor does not exceed the compressor’s
charge limit.
•
Wherever possible the system should be installed to utilize a pump down configuration.
•
Maximum recommended pipe length is 50m.
Important Note:
One of the main factors affecting equipment reliability and compressor service life is refrigeration circuit
contamination. During installation, circuit contamination can be caused by:
•
Brazing & Welding Oxides
•
Filings & Particles from de-burring pipework
•
Brazing Flux
•
Moisture & Air
Important Note:
Pipe sizing should only be determined by qualified personnel. Correct line sizing will minimize the pressure
drop and maintain sufficient gas velocity for proper oil return.
All applicable standards must be observed in the
installation of refrigerant piping.
Содержание JEHSD-0400-B3-M-3
Страница 31: ...Issue 01 08 2020 Page 31 Dimensional Drawings JEHSD 0400 B3 M 3 JEHSD 0600 B3 M 3 JEHSD 0800 B4 M 3 ...
Страница 32: ...Issue 01 08 2020 Page 32 Electrical Wiring Diagram JEHSD 0400 B3 M 3 JEHSD 0600 B3 M 3 ...
Страница 33: ...Issue 01 08 2020 Page 33 Electrical Wiring Diagram JEHSD 0800 B4 M 3 ...
Страница 39: ...Issue 01 08 2020 Page 39 Technical Information Small Version Controller ...
Страница 41: ...Issue 01 08 2020 Page 41 Certification ...
Страница 42: ...Issue 01 08 2020 Page 42 Certification ...
Страница 43: ...Issue 01 08 2020 Page 43 Certification ...