![J&D MAnufacturing JD-N2 Скачать руководство пользователя страница 13](http://html.mh-extra.com/html/jandd-manufacturing/jd-n2/jd-n2_manual_625426013.webp)
JD-N2
INSTALLATION
JD-N2
Section B-13
Powering Up Procedure
Once the JD-N2 is properly mounted on the wall and all modules and sensors
connected to the terminal block, perform the following step:
Verify all Connections
Seal all cable entry holes.
Hermetically Close the JD-N2
Close the front panel and the lower access cover.
Put the power on
Secure the front panel with a lock
Содержание JD-N2
Страница 3: ...JD N2 WIRING DIAGRAM JD N2 Section A 3 WIRING DIAGRAM JD N2 SECTION A ...
Страница 6: ...JD N2 INSTALLATION JD N2 Section B 6 INSTALLATION JD N2 SECTION B ...
Страница 19: ...JD N2 USER S GUIDE JD N2 Section C 19 USER S GUIDE JD N2 SECTION C ...
Страница 20: ...JD N2 USER S GUIDE JD N2 Section C 20 Control Description 7 3 3 5 1 2 3 4 6 ...
Страница 28: ...JD N2 INDEX WARRANTY JD N2 Section D 28 INDEX WARRANTY JD N2 SECTION D ...
Страница 32: ...JD N2 VER 1 0 February 18th 2010 ...