Preparations
႑
Before commissioning, check that the charge circuit
and climate system are filled and well vented.
႑
Check the pipe system for leaks.
Filling
and
venting
the
heating
medium
system
1.
The heating medium system is filled with water to the
required pressure.
2.
Vent the system using the venting nipple (QM20) on
the enclosed flexible hose and possibly the cir-
culation pump.
40
Compressor
heater
JAMA Inverter
is equipped with a compressor heater that
heats the compressor before start-up and when the com-
pressor is cold.
NOTE
The compressor heater must have been con-
nected for 6 – 8 hours before the first start, see the
section “Start-up and inspection” in the installer
manual for the indoor section
Chapter
6
|
Commissioning
and
adjusting
30
6
Commissioning
and
adjusting
Содержание M8
Страница 1: ...Installer manual LEK LEK LEK J M Inverter M8 M12 M16 Air water heat pump...
Страница 2: ......
Страница 16: ...LEK DATA XL2 UB1 UB2 XL1 UB3 W1 LEK DATA PF3 PF1 Chapter 3 The heat pump design 14...
Страница 47: ...Electrical circuit diagram JAMA Inverter M8 Chapter 9 Technical data 46 Kaukora Oy...
Страница 49: ...JAMA Inverter 12 Chapter 9 Technical data 48 Kaukora Oy...
Страница 51: ...JAMA Inverter 16 Chapter 9 Technical data 50 Kaukora Oy...
Страница 54: ......
Страница 55: ...Kaukora Oy PL 21 Tuotekatu 11 21200 Raisio Puh 02 4374 600 E mail kaukora kaukora fi www kaukora fi...