— 12 —
Step 2: Verifying Camera Operation
When power is supplied to the camera while the necessary equipment is connected, the
POWER/TRIG LED at the rear of the camera lights amber, and initialization of the camera
starts.When initialization is complete, the POWER/TRIG LED lights green.
Verify whether power is being supplied to the camera by checking the rear LED.
When properly turned on
* For details on how to read the LEDs, see “LED status and camera status” in the “Parts
Identification” section.
GO-5000M-PMCL-UV
Lit green
Step 3: Verifying the Connection between the Camera
and PC
Use a short ASCII command to verify whether the GO-5000M-PMCL-UV is properly recognized
in your setup.
Please install terminal emulator software capable of serial communication to the PC connected
to the camera via the frame grabber board.
Then set the following serial communication.
Please enter the command
DVN? <CR><LF>
from the terminal emulator software.
If correctly connected, response
DVN = JAI Corporation
will be displayed.
Item
Short ASCII command
Description
DeviceVendorName
DVN
Display the device vendor name.
"JAI Corporation"
Содержание GO-5000M-PMCL-UV
Страница 17: ... 17 Main Functions Camera Link Interface GO 5000M PMCL UV ...
Страница 26: ...1X8 1Y 1X8 1Y is an 8 tap readout system and outputs as follows 26 GO 5000M PMCL UV ...
Страница 27: ...Output timing Horizontal 27 GO 5000M PMCL UV The horizontal frequency is changed by setting the Tap Geometry ...
Страница 28: ... 28 GO 5000M PMCL UV ...
Страница 29: ... 29 GO 5000M PMCL UV ...
Страница 30: ... 30 GO 5000M PMCL UV ...
Страница 31: ... 31 GO 5000M PMCL UV ...
Страница 33: ...GO 5000M PMCL UV 33 ...
Страница 34: ...GO 5000M PMCL UV 34 ...
Страница 49: ...Operation and function matrix 49 GO 5000M PMCL UV ...
Страница 56: ... 56 External appearance and dimensions GO 5000M PMCL UV ...
Страница 57: ... 57 GO 5000M PMCL UV Spectral response ...
Страница 64: ... 64 GO 5000M PMCL UV Acquisition Control ...
Страница 65: ... 65 GO 5000M PMCL UV Digital I O Control Analog Control LUT Control Transport Layer Control ...
Страница 66: ... 66 GO 5000M PMCL UV User Set Control JAI Custom ...
Страница 67: ... 67 GO 5000M PMCL UV ...
Страница 68: ... 68 GO 5000M PMCL UV ...
Страница 69: ... 69 GO 5000M PMCL UV ...
Страница 70: ... 70 GO 5000M PMCL UV ...
Страница 71: ... 71 GO 5000M PMCL UV ...
Страница 72: ... 72 GO 5000M PMCL UV ...
Страница 74: ... 74 Revision Date Changes Revision history 1 0 Feb 2021 1st Draft GO 5000M PMCL UV ...