STEP 3 Install cement board.
PASO 3. Instale la pared de cemento.
BLOCKING
ENTRAMADO
CEMENT BOARD
PARED DE CEMENTO
Figure 3
Figura 3
STEP 4. Install finishing materials and caulk base leaving 1/4" weep holes.
PASO 4. Instale los materiales de acabado y la base de calafateo o recalque, dejando agujeros de desagüde 1/4".
1/4" MINIMUM
WEEP HOLE
AGUJERO DE
DESAGÜE DE
1/4" COMO MÍNIMO
SILICONE
SEALANT
SELLADOR
DE SILICONA
TILE
LOSA
TILE
ADHESIVE
ADHESIVO
PARA LOSA
1/4" MINIMUM
WEEP HOLE
AGUJERO DE
DESAGÜE DE
1/4" COMO MÍNIMO
SILICONE
SEALANT
SELLADOR
DE SILICONA
BLOCKING
ENTRAMADO
CEMENT
BOARD
PARED
DE CEMENTO
1/8" GAP
ESPACIO
DE 1/8"
Figure 4A
Figura 4A
Figure 4B
Figura 4B
GROUT
STUD
PIE
DERECHO
SHIM IF NECESSARY
USE LAMINILLAS DE
NIVELACIÓN SI ES
NECESARIO
DO NOT FILL
NO RELLENE
BLOCKING
ENTRAMADO
CEMENT
BOARD
PARED
DE CEMENTO
TILE
LOSA
SILICONE
SEALANT
SELLADOR
DE SILICONA
Figure 4C
Filling the area marked DO NOT FILL will prevent moisture
from draining back into the base through the weep holes.
Figura 4C
Si se rellena el área marcada NO RELLENE la humedad no podrá
drenar de vuelta a la base a través de los agujeros de desagüe.
3